sequence-plan

Topologically sort plan tasks into correct implementation order, renumber sequentially, and add explicit dependency/blocker metadata to enable parallel subagent execution.

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/other/sequence-plan

SKILL.md

Sequence Plan

Analyze an existing plan's tasks, determine correct implementation order based on dependencies and file overlap, renumber tasks sequentially, and add explicit blocking relationships so /build-feature can dispatch parallel subagents safely.

Operating Mode

PLAN EDITING ONLY

Allowed: read plan files, read source files listed in Affects to verify overlap, edit the plan document (task ordering, numbering, dependency fields, summary table, parallelism guide).

Not allowed: implementation code changes, creating new tasks, changing task scope/acceptance/confidence, deleting tasks.

When to Use

Run /sequence-plan when:

  • A plan has been created or updated via /plan-feature and tasks need correct execution ordering
  • Tasks were added in phases/batches and the implementation order isn't optimized
  • You want to enable parallel subagent execution for /build-feature by making blocking relationships explicit
  • A /re-plan added or removed tasks and the numbering/dependencies need cleanup
  • Planning or re-planning decomposed tasks (split into precursor chains/subtasks): run this after all structural edits and before build handoff/resume

Do not use /sequence-plan if:

  • The plan doesn't exist yet -> use /plan-feature
  • Tasks need scope/confidence changes -> use /re-plan
  • You want to build tasks -> use /build-feature

Fast Path (with argument)

If user provides a slug (e.g., /sequence-plan design-system):

  • Read docs/plans/<slug>-plan.md directly
  • Skip discovery

Discovery Path (no argument)

If no argument provided, scan docs/plans/*-plan.md for Active plans and present a table:

markdown
## Plans Available for Sequencing

| Slug | Title | Task Count | Status |
|------|-------|------------|--------|
| design-system | Design System Plan | 24 | Active |

Enter a slug to sequence.

Inputs

  • The plan doc: docs/plans/<feature-slug>-plan.md
  • Source files referenced in Affects fields (read-only, for overlap analysis)

Outputs

  • Updated plan doc with:
    • Tasks reordered and renumbered
    • Depends on fields updated with new task IDs
    • Blocks field added to each task (inverse of Depends on)
    • Task Summary table updated with new ordering
    • Parallelism Guide section added

Workflow

1) Parse Tasks

Read the plan and extract every task (skip completed, deferred, and superseded tasks). For each task, capture:

  • Current ID (e.g., DS-30, TASK-05)
  • Type (IMPLEMENT, INVESTIGATE, DECISION)
  • Explicit dependencies (Depends on field — task IDs)
  • Affects (file paths — both primary and [readonly])
  • Phase (if tasks are organized by phase)
  • Effort (S, M, L)
  • Status (Pending, In-Progress, Blocked, etc.)

2) Build Dependency Graph

Construct a directed acyclic graph (DAG) of task dependencies from three sources, in priority order:

a) Explicit dependencies (highest priority)

If task B says Depends on: TASK-A, add edge A -> B.

b) File-overlap dependencies (implicit)

If task A and task B both list the same file as primary in Affects, they cannot safely run in parallel. Determine ordering by:

  1. Infrastructure before consumers — tasks that create/define types, schemas, tokens, or shared modules come before tasks that consume them
  2. Smaller scope first — S-effort before M-effort before L-effort when both touch the same file, unless logic dictates otherwise
  3. Foundation before features — if both tasks modify index.ts (barrel file), the task adding foundational exports goes first

When file overlap creates an implicit dependency, add it to the Depends on field with a comment: (file overlap: <path>).

c) Phase ordering (soft preference)

Tasks in earlier phases are preferred before later phases, but this is a soft constraint — it can be overridden when a later-phase task has no dependencies and can run in parallel with earlier-phase work.

3) Topological Sort

Sort tasks using topological ordering (Kahn's algorithm or DFS-based):

  1. Tasks with no dependencies come first
  2. Among tasks with equal dependency depth, prefer:
    • INVESTIGATE/DECISION before IMPLEMENT (they unblock others)
    • Lower phase number
    • Smaller effort (S before M before L)
    • Alphabetical by description (stable tiebreak)
  3. Detect cycles — if found, report them and STOP (cycles indicate a planning error that needs /re-plan)

4) Renumber Tasks

Assign new sequential IDs using the plan's domain prefix:

  • If original IDs use a domain prefix (e.g., DS-), preserve it: DS-01, DS-02, ...
  • If original IDs use TASK-, continue with that: TASK-01, TASK-02, ...
  • Use zero-padded two-digit numbers: -01, -02, ... -99

Build a rename map (old ID -> new ID) for updating all cross-references.

5) Update Dependencies and Add Blockers

For each task:

  • Update Depends on: Replace old task IDs with new IDs using the rename map
  • Add Blocks field: The inverse of Depends on. If TASK-03 depends on TASK-01, then TASK-01 blocks TASK-03. Format: Blocks: TASK-03, TASK-07
  • If a task has no dependencies: Depends on: -
  • If a task blocks nothing: Blocks: -

6) Identify Parallel Execution Groups

Analyze the DAG to identify which tasks can run concurrently. A parallel group is a set of tasks that:

  • Share no dependencies between each other
  • Have all their prerequisites completed (or share the same prerequisites)
  • Do not modify overlapping files

Produce a Parallelism Guide showing execution waves:

markdown
## Parallelism Guide

Execution waves for subagent dispatch. Tasks within a wave can run in parallel.
Tasks in a later wave require all blocking tasks from earlier waves to complete.

| Wave | Tasks | Prerequisites | Notes |
|------|-------|---------------|-------|
| 1 | TASK-01, TASK-02, TASK-03 | - | Independent foundation tasks |
| 2 | TASK-04, TASK-05 | Wave 1: TASK-01 | TASK-04 needs TASK-01; TASK-05 needs TASK-01 |
| 3 | TASK-06 | Wave 2: TASK-04 | Sequential bottleneck |
| 4 | TASK-07, TASK-08 | Wave 3: TASK-06 | Both need TASK-06 |

**Max parallelism:** 3 (Wave 1)
**Critical path:** TASK-01 -> TASK-04 -> TASK-06 -> TASK-07 (4 waves)
**Total tasks:** 8

7) Update the Plan Document

Apply all changes to the plan file:

a) Task Summary Table

Rewrite the table with new IDs, correct ordering, and updated Depends on:

markdown
## Task Summary

| Task ID | Type | Description | Confidence | Effort | Status | Depends on | Blocks |
|---|---|---|---:|---|---|---|---|
| DS-01 | IMPLEMENT | ... | 92% | S | Pending | - | DS-05, DS-10 |
| DS-02 | IMPLEMENT | ... | 90% | M | Pending | - | DS-06 |

b) Task Sections

  • Reorder task sections (### TASK-XX: ...) to match new numbering
  • Update all task IDs in headers and body text
  • Update Depends on fields with new IDs
  • Add Blocks field after Depends on in each task
  • Update any cross-references in Notes/references fields

c) Phase Headers (preserve or restructure)

  • If phases are still meaningful groupings after reordering, preserve phase headers
  • If reordering makes phases misleading, replace phase headers with a simpler structure and note the original phase in each task's metadata

d) Add Parallelism Guide

Insert the Parallelism Guide section after the Task Summary table.

8) Validate

After editing, verify:

  • Every task ID in any Depends on or Blocks field exists in the plan
  • No circular dependencies
  • Completed/deferred tasks were not renumbered or moved (they stay in their historical section)
  • The rename map accounts for all references (grep old IDs — should find zero matches in active tasks)

9) Completion Summary

Report what changed:

markdown
## Sequencing Complete

**Plan:** docs/plans/<slug>-plan.md
**Tasks sequenced:** N active tasks reordered and renumbered
**Rename map:**
- DS-30 -> DS-01
- DS-35 -> DS-02
- ...

**Dependency changes:**
- N explicit dependencies preserved
- M implicit dependencies added (file overlap)
- No cycles detected

**Parallel execution:**
- K execution waves identified
- Max parallelism: P tasks in wave N
- Critical path length: W waves

Ready for `/build-feature`.

Handling Edge Cases

Completed Tasks

Tasks with status Complete (YYYY-MM-DD) are not reordered or renumbered. They stay in their historical section. If an active task depends on a completed task, the dependency is noted as satisfied: Depends on: DS-61 (complete).

Deferred Tasks

Tasks with status Deferred are not included in the sequencing. They stay in the Deferred section. Note them in the Parallelism Guide footer.

In-Progress Tasks

Tasks with status In-Progress are included in sequencing but flagged:

markdown
> **Note:** TASK-03 is currently In-Progress. Its position in the sequence reflects its dependencies, not a suggestion to restart it.

Tasks with Ranges in Dependencies

Some tasks use range syntax (e.g., DS-73–DS-77). Expand these to explicit lists during renumbering: Depends on: DS-10, DS-11, DS-12, DS-13, DS-14.

Quality Checks

  • All active tasks have been assigned new sequential IDs
  • The rename map is complete (no orphaned old IDs in active sections)
  • Every Depends on reference points to a valid task ID
  • Every Blocks field is the correct inverse of Depends on
  • No circular dependencies exist
  • File-overlap dependencies have been identified and documented
  • Parallelism Guide correctly groups non-conflicting tasks into waves
  • Completed and deferred tasks are untouched
  • Task Summary table matches the new ordering
  • Critical path is identified

Completion Messages

Success:

"Plan sequenced. N tasks reordered into K execution waves (max parallelism: P). Critical path: W waves. Rename map applied. Ready for /build-feature."

Cycle detected:

"Cannot sequence — circular dependency detected between TASK-A and TASK-B. Run /re-plan to resolve the cycle before sequencing."

No changes needed:

"Plan is already correctly sequenced. No reordering required."