Agent skill

lp-do-replan

Thin orchestrator for resolving low-confidence plan tasks with evidence, explicit precursor tasks, stable task IDs, and checkpoint-aware reassessment.

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/other/lp-do-replan

SKILL.md

Re-Plan Orchestrator

/lp-do-replan updates an existing plan by converting uncertainty into evidence-backed task updates.

This orchestrator owns:

  1. task selection and mode detection,
  2. canonical replan gates,
  3. module routing,
  4. structured plan delta updates,
  5. sequencing handoff,
  6. decision-oriented completion output.

Global Invariants

Operating mode

RE-PLANNING ONLY

Allowed actions

  • Read/search files and docs.
  • Run read-only commands needed for evidence (for example targeted tests, type checks, grep/ripgrep, static analysis commands).
  • Update plan and replan notes docs.

Prohibited actions

  • Production implementation/refactor/migration changes.
  • Destructive shell/git commands.
  • Writing throwaway probe code in this skill.

If an assumption requires executable probe code, create a SPIKE precursor task instead of writing probes in /lp-do-replan.

Inputs

  • Existing plan: docs/plans/<feature-slug>/plan.md (legacy fallback allowed)
  • Optional task IDs to target
  • Optional fact-find brief

If plan is missing, route to /lp-do-plan (or create initial plan from fact-find then return).

Invocation Modes

  • standard: low-confidence/missing-contract replanning
  • checkpoint: mid-build reassessment when /lp-do-build hits CHECKPOINT

Load checkpoint module only in checkpoint mode.

Replan Gates (Canonical)

Evaluate and record these gates for each affected task:

  1. Promotion Gate
  • <80 -> >=80 requires E2+ evidence or explicit precursor chain.
  1. Validation Gate
  • Runnable tasks require complete validation contracts before Ready status (task-type appropriate).
  1. Precursor Gate
  • Unresolved unknowns become formal precursor tasks (INVESTIGATE or SPIKE).
  • No inline "needs spike" notes.
  1. Sequencing Gate
  • If topology changed (tasks added/split/removed/dependencies updated), run /lp-do-sequence in stable-ID mode (no renumbering).
  1. Escalation Gate
  • Ask user only when decision intent cannot be inferred after evidence review.

Shared doctrine sources:

  • ../_shared/confidence-protocol.md
  • ../_shared/evidence-ladder.md
  • ../_shared/fail-first-biz.md
  • ../_shared/validation-contracts.md
  • ../_shared/replan-update-format.md
  • ../_shared/precursor-doctrine.md

Phase 1: Select Scope

Target explicit IDs when provided; otherwise include:

  • all IMPLEMENT tasks below 80,
  • all SPIKE tasks below 80,
  • all INVESTIGATE tasks below 60,
  • runnable tasks with missing/incomplete validation contracts,
  • direct dependents affected by those tasks.

Phase 2: Classify Track and Route

Determine per task:

  • Execution-Track: code | business-artifact | mixed

Route modules:

  • code -> modules/replan-code.md
  • business-artifact -> modules/replan-biz.md
  • mixed -> both modules + modules/replan-validation.md
  • missing/weak validation contracts -> modules/replan-validation.md
  • checkpoint invocation -> add modules/replan-checkpoint.md

Phase 3: Apply Deltas to Plan

Use compact delta format from:

  • ../_shared/replan-update-format.md

Keep in-plan updates concise; put detailed evidence in:

  • docs/plans/<feature-slug>/replan-notes.md when needed.

ID policy:

  • Preserve existing TASK-IDs.
  • New tasks get next available TASK-ID and remain stable.
  • Dependencies reference stable TASK-IDs.

Phase 3.5: Walkthrough Refresh Gate

If the replan changes process topology or operating-model behavior — branch triggers, CI/deploy lanes, approval paths, lifecycle states, handoffs, or multi-app orchestration — refresh the plan's ## Delivered Processes section, not just the task tables.

Rules:

  • Re-walk only the affected areas, but keep the full end-state flow internally consistent.
  • Update unresolved seams or known issues when task splits, new precursor tasks, or dependency changes alter the delivered process.
  • If the refreshed walkthrough exposes a new blocking seam, convert it into an explicit precursor task or lower readiness.

Phase 4: Sequencing

When topology changed, run /lp-do-sequence with stable IDs preserved.

Expected sequence behavior for replan flows:

  • reorder tasks,
  • refresh Depends on / Blocks consistency,
  • refresh Parallelism Guide,
  • do not renumber task IDs.

Replan Depth Gate

Track the replan round count in docs/plans/<feature-slug>/replan-notes.md using a frontmatter field Replan-round: N. Increment on each invocation.

If any task has been below its type threshold across 3+ consecutive replan rounds without new evidence or a viable new precursor path:

  • Declare that task Infeasible in the plan with a one-line kill rationale.
  • If all tasks that were the target of this replan are now Infeasible and no other runnable tasks remain: set plan Status: Infeasible in frontmatter, write a ## Kill Rationale block, surface to user, and stop. Do not route to /lp-do-build.

Phase 5: Readiness Decision

  • Ready: runnable tasks meet type thresholds (IMPLEMENT/SPIKE >=80, INVESTIGATE >=60) and have complete validation contracts.
  • Partially ready: precursor chain created; blocked tasks remain below type threshold. Build precursor tasks first.
  • Blocked (pending-decision): a DECISION task requires user input to proceed. Surface the specific question; build cannot continue until resolved.
  • Blocked (low-confidence): tasks remain below threshold with no viable precursor path and have not yet hit the 3-round depth limit. Escalate to user for scope clarification.
  • Infeasible: tasks declared infeasible after hitting the replan depth gate. Pipeline ends.

Completion Messages

Ready:

Re-plan complete. Updated docs/plans/<feature-slug>/plan.md. Stable task IDs preserved. Eligible tasks are ready for /lp-do-build. If invoked from a CHECKPOINT in an active build pipeline: automatically resume /lp-do-build <feature-slug> without waiting for manual invocation.

Partially ready:

Re-plan complete. Added precursor chain(s) and updated dependencies with stable task IDs. Build precursor tasks first, then re-run /lp-do-replan for blocked tasks.

Blocked (pending-decision):

Re-plan blocked. DECISION required: [specific question]. Build cannot continue until resolved. See docs/plans/<feature-slug>/replan-notes.md.

Blocked (low-confidence):

Re-plan complete but confidence floor not reached. No viable precursor path found. Escalating to user — scope clarification required before proceeding.

Infeasible:

Re-plan terminated. Task(s) [IDs] declared infeasible after [N] replan rounds with no viable path. Plan Status: Infeasible. See ## Kill Rationale in plan. Pipeline ends here.

Quick Checklist

  • Evidence-based confidence adjustments only
  • Unknowns converted to formal precursor tasks
  • Validation contracts complete for runnable tasks
  • Stable task IDs preserved
  • ## Delivered Processes refreshed when the replan changed operating-model behavior
  • /lp-do-sequence run after topology changes (no renumber)

Expand your agent's capabilities with these related and highly-rated skills.

Didn't find tool you were looking for?

Be as detailed as possible for better results