Agent skill

lp-do-assessment-07-measurement-profiling

Measurement profiling for new startups (ASSESSMENT-07). Elicits tracking setup, ≥2 key metrics, success thresholds, and data collection feasibility. Produces a measurement-plan artifact ready for current situation capture. Upstream of lp-do-assessment-08-current-situation.

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/other/lp-do-assessment-07-measurement-profiling

SKILL.md

lp-do-assessment-07-measurement-profiling — Measurement Profiling (ASSESSMENT-07)

Elicits and records how the operator will measure whether the distribution plan is working. Defines the tracking method, ≥2 key metrics, success thresholds, and confirms data collection is feasible.

Invocation

/lp-do-assessment-07-measurement-profiling --business <BIZ>

Required:

  • --business <BIZ> — 3-4 character business identifier

Business resolution pre-flight: If --business is absent or the directory docs/business-os/strategy/<BIZ>/ does not exist, apply _shared/business-resolution.md before any other step.

Operating Mode

ELICIT + WRITE

This skill:

  • Reads ASSESSMENT-03 (selected product), ASSESSMENT-06 (channels identified)
  • Pre-populates a draft from any measurement context already documented in strategy docs
  • Surfaces gaps and asks the operator to fill or confirm each field
  • Writes the final ASSESSMENT-07 artifact

Does NOT:

  • Set up actual tracking infrastructure (that is S1B territory)
  • Research industry benchmarks for conversion rates or CAC (that is S3 territory)
  • Set field values the operator has not confirmed

Precursor Inputs

Read before eliciting any fields:

  • docs/business-os/strategy/<BIZ>/s0c-option-select.user.md — selected product (what is being measured)
  • docs/business-os/strategy/<BIZ>/<YYYY-MM-DD>-launch-distribution-plan.user.md — channels (what needs instrumentation)
  • Any existing strategy doc with measurement or analytics references

Elicitation Questions

Present as a structured Q&A. Pre-populate from existing docs where possible; mark pre-populated answers as (pre-filled — confirm or correct).

Section A — Tracking Setup

  1. What tool or method will you use to track results? (e.g. GA4, Plausible, spreadsheet, Etsy dashboard, manual order log)
  2. Can this be set up with current resources? (yes / no — if no, what is blocking?)

Section B — Key Metrics

For each metric (minimum 2):

  1. Metric name (e.g. "revenue", "conversion rate", "units sold", "email signups", "CAC")
  2. How will it be captured? (tool/method from Section A, or separate source)
  3. Reporting frequency: daily / weekly / monthly

Section C — Success Thresholds

  1. What does "working" look like at 30 days? (e.g. "≥5 orders", "≥€500 revenue", "≥2% conversion")
  2. What would trigger a channel reassessment? (e.g. "<1 order/week for 4 weeks")

Section D — Data Collection Feasibility

  1. Is data collection GDPR/privacy-compliant? (yes / no — if no, describe required changes)
  2. Does collection require any tooling or access not currently available? (yes / no — if yes, describe)

Output Artifact

Path: docs/business-os/strategy/<BIZ>/<YYYY-MM-DD>-measurement-profile.user.md

Frontmatter:

yaml
---
Type: Measurement-Plan
Stage: ASSESSMENT-07
Business: <BIZ>
Status: Draft
Created: <today>
Updated: <today>
Owner: <operator name>
---

Sections:

A) Tracking Setup

Field Value
Primary tracking tool/method <e.g. GA4 + manual order log>
Setup feasibility <yes — available now / conditional — requires X>

B) Key Metrics

Metric Capture method Frequency
<metric 1> <tool / source> daily / weekly / monthly
<metric 2> <tool / source> daily / weekly / monthly

C) Success Thresholds

Horizon "Working" threshold Reassessment trigger
30 days <e.g. ≥5 orders or ≥€500 revenue> <e.g. <1 order/week for 4 weeks>

D) Data Collection Feasibility

Check Status Notes
GDPR/privacy compliance ✅ compliant / ⚠️ requires action
Tooling availability ✅ available / ⚠️ requires setup

Quality Gate

Before saving, verify:

  • Section A has a named tracking tool/method and feasibility status
  • Section B has ≥2 metrics, each with capture method and frequency
  • Section C has a 30-day "working" threshold and reassessment trigger
  • Section D completed (privacy + tooling feasibility both addressed)
  • Frontmatter fields all present: Type, Stage, Business, Status, Created, Updated, Owner
  • Artifact saved to correct path before completion message

Red Flags

Invalid outputs — do not emit:

  • Fewer than 2 metrics in Section B (minimum 2 required for ASSESSMENT gate to pass)
  • "We'll know if it works" (Section C must have specific numeric thresholds)
  • Section D skipped (GDPR compliance check is mandatory)
  • Artifact not saved (output must be written to file, not only displayed in chat)

Completion Message

"Measurement plan recorded: docs/business-os/strategy/<BIZ>/<YYYY-MM-DD>-measurement-profile.user.md. [N] metrics defined; tracking via [method]. Ready for ASSESSMENT-08 Current Situation."


Integration

Upstream (ASSESSMENT-06): Runs after /lp-do-assessment-06-distribution-profiling --business <BIZ> produces <YYYY-MM-DD>-launch-distribution-plan.user.md.

Downstream consumer: modules/assessment-intake-sync.md reads <YYYY-MM-DD>-measurement-profile.user.md as its sixth precursor (ASSESSMENT-07). Section B metrics inform intake Section F (Missing-Data Checklist — any metric with feasibility gap). Section A tracking setup informs intake Section A (Execution posture).

Downstream: /lp-do-assessment-08-current-situation --business <BIZ> runs after this artifact is active. ASSESSMENT gate checks ≥2 metrics and a named tracking method before allowing ASSESSMENT→S1 advance.

Expand your agent's capabilities with these related and highly-rated skills.

Didn't find tool you were looking for?

Be as detailed as possible for better results