Project Manager role: PMBOK 7/8 (8 Performance Domains, 12 Principles), PM tools (Jira, ClickUp, Linear, GitHub Projects, Azure DevOps), risk/schedule/cost management, EVM, agile ceremonies, dashboards. 32 methodologies.

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/faion-project-manager-faionfaion-faion-network

SKILL.md

PM Domain Skill

References

Reference Content Lines
pm-tools.md Jira, ClickUp, Linear, GitHub Projects, GitLab, Azure DevOps, Notion, Trello, migrations, dashboards ~1926

Agents

Agent When to Use
faion-pm-agent Execute PMBOK 7/8 methodologies for project management

Communication: User's language. Docs/code: English.

Purpose

Orchestrates project management activities using PMBOK 7th Edition (2021) and PMBOK 8 principles. This domain skill provides professional PM methodologies for solopreneurs and teams.

3-Layer Architecture

Layer 1: Domain Skills (this) - orchestrators
    |
    v call
Layer 2: Agents - executors
    |
    v use
Layer 3: Technical Skills - tools

PMBOK 7 Performance Domains (8)

Performance domains are interactive, interrelated, and interdependent areas of focus that work together throughout a project.

PD-01: Stakeholder Performance Domain

Focus: Engaging stakeholders effectively throughout the project.

Activities

  1. Identify stakeholders - Who is affected by or can affect the project?
  2. Understand stakeholders - Analyze interests, power, influence, expectations
  3. Engage stakeholders - Develop appropriate engagement strategies
  4. Monitor engagement - Track and adapt engagement effectiveness

Outcomes

  • Productive working relationship with stakeholders
  • Stakeholder agreement on project objectives
  • Stakeholders supportive of deliverables
  • Stakeholders satisfied with outcomes

Checking Results

Indicator What to Check
Engagement Are stakeholders actively participating?
Satisfaction Are expectations being met?
Conflict Are issues resolved constructively?
Support Do stakeholders advocate for the project?

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-001" (Stakeholder Register)
  methodology: "M-PM-002" (Stakeholder Analysis Matrix)

PD-02: Team Performance Domain

Focus: Building and leading high-performing teams.

Activities

  1. Project manager leadership - Set vision, inspire, remove obstacles
  2. Team development - Build skills, foster collaboration
  3. Team culture - Create psychological safety, shared values
  4. High-performing teams - Enable autonomy, accountability

Outcomes

  • Shared ownership of project
  • High-performing team
  • Appropriate leadership demonstrated
  • Team members grow and develop

Team Development Stages

Stage Focus Leader Action
Forming Orientation Direct, provide clarity
Storming Conflict Facilitate, resolve conflicts
Norming Cohesion Coach, enable collaboration
Performing High function Delegate, remove obstacles
Adjourning Completion Celebrate, transition

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-003" (RACI Matrix)
  methodology: "M-PM-004" (Team Charter)

PD-03: Development Approach and Life Cycle Performance Domain

Focus: Selecting and tailoring appropriate development approaches.

Development Approaches

Approach When to Use Characteristics
Predictive Stable requirements, known solution Sequential phases, upfront planning
Iterative Unknown solution, needs refinement Repeated cycles, prototype-based
Incremental Needs early value delivery Feature-based releases
Agile High uncertainty, rapid change Iterative + incremental, adaptive
Hybrid Mixed needs Combines approaches

Selection Factors

  • Requirements stability
  • Stakeholder availability
  • Risk tolerance
  • Regulatory constraints
  • Team experience

Life Cycle Phases

  1. Starting - Authorization, initial scope
  2. Organizing and Preparing - Planning, team formation
  3. Carrying Out - Execution, monitoring
  4. Ending - Closure, transition

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-005" (Development Approach Selection)
  methodology: "M-PM-006" (Project Life Cycle Design)

PD-04: Planning Performance Domain

Focus: Organizing and elaborating how work will be done.

Planning Components

Component Purpose Key Activities
Scope What to deliver WBS, requirements
Schedule When to deliver Sequencing, estimation
Cost How much it costs Budgeting, reserves
Resources Who/what does work Team, equipment, materials
Quality How good enough Standards, metrics
Risk What could go wrong Identification, response
Communications How to share info Channels, frequency
Procurement What to buy Contracts, vendors
Stakeholder How to engage Strategies, monitoring

Planning Progression

Progressive elaboration:
High-level --> Detailed --> Rolling wave

Uncertainty decreases as project progresses

Estimation Techniques

Technique Accuracy When to Use
Analogous Low Early stages
Parametric Medium Historical data available
Bottom-up High Detailed scope defined
Three-point Variable Risk-aware estimation

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-007" (WBS Creation)
  methodology: "M-PM-008" (Schedule Development)
  methodology: "M-PM-009" (Cost Estimation)

PD-05: Project Work Performance Domain

Focus: Executing project activities to deliver outcomes.

Activities

  1. Manage physical resources - Equipment, materials, facilities
  2. Manage procurements - Vendor relationships, contracts
  3. Monitor changes - Track scope, schedule, cost variances
  4. Enable learning - Capture and share knowledge
  5. Manage communications - Information flow to stakeholders

Project Work Processes

Plan -> Execute -> Monitor -> Adjust -> Repeat
        |                        ^
        +------------------------+

Communication Matrix

Stakeholder What When How Who
Sponsor Status summary Weekly Email PM
Team Daily progress Daily Standup PM
Customer Milestone report Monthly Meeting PM

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-010" (Communication Management Plan)
  methodology: "M-PM-011" (Change Management Process)

PD-06: Delivery Performance Domain

Focus: Delivering value and outcomes throughout the project.

Value Delivery

Concept Description
Deliverables Outputs produced by project work
Outcomes End results from using deliverables
Benefits Gains realized from outcomes
Value Worth to stakeholders

Delivery Approaches

Approach Delivery Timing Examples
Single delivery End of project Construction, one-time event
Multiple deliveries Throughout project Software releases, phases
Continuous delivery Ongoing SaaS features, content

Quality Management

Plan Quality -> Manage Quality -> Control Quality
     |               |                 |
     v               v                 v
  Standards     Prevention        Inspection

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-012" (Quality Management Plan)
  methodology: "M-PM-013" (Acceptance Criteria Definition)

PD-07: Measurement Performance Domain

Focus: Tracking progress and performance.

Key Metrics

Category Metrics
Schedule SPI, variance, on-time %
Cost CPI, variance, budget remaining
Scope Requirements completed, defects
Quality Defect rate, rework %
Resources Utilization, productivity
Stakeholder Satisfaction, engagement

Earned Value Management (EVM)

Metric Formula Interpretation
PV Planned Value Budget for scheduled work
EV Earned Value Budget for completed work
AC Actual Cost Actual spend
SV EV - PV Schedule variance
CV EV - AC Cost variance
SPI EV / PV Schedule performance (>1 good)
CPI EV / AC Cost performance (>1 good)
EAC BAC / CPI Estimate at completion

Dashboard Elements

  • Overall health indicator (RAG)
  • Key performance metrics
  • Trend analysis
  • Risk status
  • Milestone status

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-014" (Earned Value Management)
  methodology: "M-PM-015" (Project Dashboard Design)

PD-08: Uncertainty Performance Domain

Focus: Navigating risks, ambiguity, and complexity.

Types of Uncertainty

Type Description Response
Risk Known unknowns, can estimate probability Risk management
Ambiguity Unclear understanding Clarification, prototypes
Complexity Interconnected systems Systems thinking
Volatility Rapid change Flexibility, reserves

Risk Response Strategies

For Threats:

  • Avoid - Eliminate the threat
  • Mitigate - Reduce probability or impact
  • Transfer - Shift to third party
  • Accept - Acknowledge without action

For Opportunities:

  • Exploit - Ensure realization
  • Enhance - Increase probability or impact
  • Share - Transfer to best positioned party
  • Accept - Take advantage if occurs

Risk Register

ID Risk Probability Impact Score Response Owner
R1 ... H/M/L H/M/L P x I Strategy Name

Agent Integration

Call faion-pm-agent with:
  methodology: "M-PM-016" (Risk Register)
  methodology: "M-PM-017" (Risk Response Planning)

PMBOK 7 Principles (12)

Principles guide behavior and decision-making throughout project work.

P-01: Stewardship

Statement: Be a diligent, respectful, and caring steward.

Application:

  • Act with integrity and ethics
  • Consider broad impact of decisions
  • Be accountable for resources
  • Respect others and their perspectives

Indicators:

  • Trust from stakeholders
  • Ethical decision-making
  • Resource efficiency
  • Long-term thinking

P-02: Team

Statement: Build a culture of accountability and respect.

Application:

  • Foster collaborative environment
  • Enable diverse perspectives
  • Support individual and team growth
  • Create psychological safety

Team Health Check:

  • Members feel safe to speak up
  • Conflicts resolved constructively
  • Contributions recognized
  • Learning encouraged

P-03: Stakeholders

Statement: Engage stakeholders proactively.

Application:

  • Identify all affected parties
  • Understand expectations and influence
  • Communicate appropriately
  • Build and maintain relationships

Engagement Levels:

Level Description
Unaware Not aware of project
Resistant Aware but opposed
Neutral Aware, neither supportive nor resistant
Supportive Aware and supportive
Leading Actively engaged and championing

P-04: Value

Statement: Focus on value.

Application:

  • Align project with business objectives
  • Prioritize work that delivers value
  • Measure outcomes, not just outputs
  • Continuously reassess value

Value Questions:

  • What problem are we solving?
  • Who benefits and how?
  • How do we measure success?
  • What is the cost of not doing this?

P-05: Systems Thinking

Statement: Recognize, evaluate, and respond to system dynamics.

Application:

  • See the whole, not just parts
  • Understand interdependencies
  • Consider unintended consequences
  • Optimize the system, not components

Systems View:

Internal: Project <-> Portfolio <-> Organization
External: Regulatory <-> Market <-> Technology <-> Society

P-06: Leadership

Statement: Demonstrate leadership behaviors.

Application:

  • Inspire and motivate
  • Adapt style to situation
  • Enable others to lead
  • Model desired behaviors

Leadership Styles:

Style When to Use
Directing Low skill, high will
Coaching Low skill, low will
Supporting High skill, low will
Delegating High skill, high will

P-07: Tailoring

Statement: Tailor based on context.

Application:

  • Adapt processes to project needs
  • Consider constraints and environment
  • Balance rigor with agility
  • Document tailoring decisions

Tailoring Factors:

  • Project size and complexity
  • Team experience
  • Organizational culture
  • Regulatory requirements
  • Risk tolerance

P-08: Quality

Statement: Build quality into processes and deliverables.

Application:

  • Define quality standards upfront
  • Prevent defects, don't just detect
  • Integrate quality activities
  • Continuously improve

Quality Dimensions:

  • Performance (does it work?)
  • Conformance (meets requirements?)
  • Reliability (consistent?)
  • Durability (long-lasting?)
  • Serviceability (maintainable?)

P-09: Complexity

Statement: Navigate complexity.

Application:

  • Recognize complexity sources
  • Use appropriate strategies
  • Avoid oversimplification
  • Embrace emergence when needed

Complexity Sources:

Source Example
Human behavior Stakeholder politics
System behavior Integration issues
Ambiguity Unclear requirements
Technological New or unproven tech

P-10: Risk

Statement: Optimize risk responses.

Application:

  • Balance risk with reward
  • Consider risk tolerance
  • Address both threats and opportunities
  • Maintain risk awareness

Risk Appetite Levels:

Level Characteristic
Risk-averse Prefer certainty, avoid threats
Risk-neutral Balanced approach
Risk-seeking Accept higher risk for higher reward

P-11: Adaptability and Resilience

Statement: Embrace adaptability and resilience.

Application:

  • Build flexibility into plans
  • Learn from experience
  • Recover from setbacks
  • Anticipate change

Resilience Practices:

  • Short feedback cycles
  • Reserve capacity
  • Alternative strategies
  • Continuous learning

P-12: Change

Statement: Enable change to achieve the envisioned future state.

Application:

  • Prepare stakeholders for change
  • Address resistance constructively
  • Sustain change through reinforcement
  • Measure change adoption

Change Readiness:

  • Clear vision communicated
  • Stakeholders prepared
  • Support systems in place
  • Quick wins planned

Methodologies (20)

M-PM-001: Stakeholder Register

Problem

Need to identify and track all project stakeholders with their characteristics and engagement approach.

Framework

  1. Identify stakeholders

    • Brainstorm with team
    • Review organization charts
    • Analyze contracts and agreements
  2. Analyze stakeholders

    • Power/Interest grid
    • Influence/Impact matrix
    • Salience model (Power, Legitimacy, Urgency)
  3. Document in register

    • Contact information
    • Role and relationship
    • Expectations and influence
    • Engagement strategy

Template

ID Name Role Power Interest Current Desired Strategy
S1 ... ... H/M/L H/M/L Level Level Approach

Agent

Execute with: faion-pm-agent


M-PM-002: Stakeholder Analysis Matrix

Problem

Need to visualize stakeholder positioning for engagement planning.

Framework

Power/Interest Grid:

         High Power
              |
    Keep      |    Manage
   Satisfied  |    Closely
              |
   -----------+----------- High Interest
              |
    Monitor   |    Keep
   (Minimum)  |   Informed
              |
         Low Power

Template

Quadrant Stakeholders Strategy
Manage Closely High power, high interest Active engagement
Keep Satisfied High power, low interest Periodic updates
Keep Informed Low power, high interest Regular communication
Monitor Low power, low interest Minimal effort

Agent

Execute with: faion-pm-agent


M-PM-003: RACI Matrix

Problem

Need to clarify roles and responsibilities for project activities.

Framework

Role Meaning Rules
R Responsible Does the work At least one per activity
A Accountable Final authority Exactly one per activity
C Consulted Input before decision Can be multiple
I Informed Notified of outcome Can be multiple

Template

Activity Role A Role B Role C Role D
Task 1 A R C I
Task 2 A R - I
Task 3 A C R I

Validation

  • Each row has exactly one A
  • Each row has at least one R
  • A and R can be same person
  • No role overload (too many Rs)

Agent

Execute with: faion-pm-agent


M-PM-004: Team Charter

Problem

Need to establish team agreements, norms, and working arrangements.

Framework

  1. Team Purpose - Why we exist
  2. Team Values - What we stand for
  3. Working Agreements - How we work
  4. Communication Norms - How we communicate
  5. Decision Making - How we decide
  6. Conflict Resolution - How we resolve issues

Template

markdown
# Team Charter: [Project Name]

## Purpose
[One sentence describing team's mission]

## Values
- [Value 1]: [Description]
- [Value 2]: [Description]

## Working Agreements
- [ ] Core hours: [time range]
- [ ] Response time: [expectation]
- [ ] Meeting etiquette: [norms]

## Communication
| Type | Channel | Response Time |
|------|---------|---------------|
| Urgent | [channel] | [time] |
| Normal | [channel] | [time] |
| FYI | [channel] | [time] |

## Decision Making
[Process for making team decisions]

## Conflict Resolution
[Steps for resolving disagreements]

## Signatures
[Team member acknowledgments]

Agent

Execute with: faion-pm-agent


M-PM-005: Development Approach Selection

Problem

Need to choose the right development approach for the project context.

Framework

Assessment Questions:

Factor Predictive Agile
Requirements Stable, well-defined Evolving, emergent
Technology Proven, familiar New, experimental
Stakeholder availability Limited High
Team experience Traditional PM Agile methods
Risk tolerance Low High
Delivery frequency Single Continuous

Scoring:

  • Count factors favoring each approach
  • Consider organizational constraints
  • Hybrid if mixed results

Template

Factor Score (1-5) Favors
Requirements stability
Technology novelty
Stakeholder availability
Team agile experience
Regulatory constraints
Need for early delivery
Total Recommendation

Agent

Execute with: faion-pm-agent


M-PM-006: Project Life Cycle Design

Problem

Need to structure the project into phases with appropriate gates.

Framework

Phase Components:

  • Entry criteria
  • Key activities
  • Deliverables
  • Exit criteria (gate)

Common Patterns:

Pattern Phases Use Case
Waterfall Requirements -> Design -> Build -> Test -> Deploy Stable requirements
Iterative Concept -> [Elaborate -> Build -> Review]* -> Transition Solution discovery
Incremental [Plan -> Develop -> Release]* Phased delivery
Agile [Sprint]* Continuous adaptation

Template

markdown
# Project Life Cycle: [Project Name]

## Phase 1: [Name]
- Entry: [Criteria]
- Activities: [List]
- Deliverables: [List]
- Gate: [Decision criteria]

## Phase 2: [Name]
...

Agent

Execute with: faion-pm-agent


M-PM-007: WBS Creation

Problem

Need to decompose project scope into manageable work packages.

Framework

Decomposition Rules:

  1. 100% rule - WBS contains all work
  2. Mutually exclusive - No overlap
  3. Deliverable-oriented - Focus on outcomes
  4. 8/80 rule - Work packages 8-80 hours

Levels:

  1. Project
  2. Deliverables / Phases
  3. Sub-deliverables
  4. Work Packages

Template

1.0 Project Name
    1.1 Deliverable 1
        1.1.1 Sub-deliverable 1.1
            1.1.1.1 Work Package
            1.1.1.2 Work Package
        1.1.2 Sub-deliverable 1.2
    1.2 Deliverable 2
    1.3 Project Management

Validation Checklist

  • All scope included (100% rule)
  • No overlapping work
  • Consistent decomposition level
  • Work packages are 8-80 hours
  • Deliverable-oriented (nouns)

Agent

Execute with: faion-pm-agent


M-PM-008: Schedule Development

Problem

Need to create a realistic project schedule with dependencies.

Framework

Steps:

  1. Define activities (from WBS)
  2. Sequence activities (dependencies)
  3. Estimate durations
  4. Develop schedule
  5. Identify critical path

Dependency Types:

Type Meaning Example
FS Finish-to-Start Code before test
FF Finish-to-Finish Parallel completion
SS Start-to-Start Parallel start
SF Start-to-Finish Rare, relief coverage

Estimation Methods:

  • Expert judgment
  • Analogous (similar projects)
  • Parametric (formula-based)
  • Three-point (O + 4M + P) / 6

Template

ID Activity Duration Predecessors Start End
A1 ... 5d -
A2 ... 3d A1

Agent

Execute with: faion-pm-agent


M-PM-009: Cost Estimation

Problem

Need to estimate project costs accurately for budgeting.

Framework

Cost Categories:

  • Labor (internal, external)
  • Materials and supplies
  • Equipment (purchase, rental)
  • Facilities
  • Travel
  • Reserves (contingency, management)

Estimation Techniques:

Technique Accuracy Phase
Rough Order of Magnitude -50% to +100% Initiation
Budget Estimate -10% to +25% Planning
Definitive Estimate -5% to +10% Execution

Template

WBS ID Description Labor Materials Other Total
1.1.1 ... $ $ $ $
Subtotal $ $ $ $
Contingency (%) $
Total Budget $

Agent

Execute with: faion-pm-agent


M-PM-010: Communication Management Plan

Problem

Need to ensure effective information flow to all stakeholders.

Framework

5 W's of Communication:

  • Who needs information?
  • What information is needed?
  • When is it needed?
  • Where/how to deliver?
  • Who is responsible?

Template

Stakeholder Information Frequency Channel Owner Notes
Sponsor Status report Weekly Email PM
Team Task updates Daily Standup PM
Customer Milestone review Monthly Meeting PM

Communication Channels Formula

Channels = n(n-1) / 2
Where n = number of people

Example: 10 people = 45 channels

Agent

Execute with: faion-pm-agent


M-PM-011: Change Management Process

Problem

Need to control scope, schedule, and cost changes formally.

Framework

Change Control Process:

  1. Request submitted
  2. Impact analyzed
  3. Decision made (approve/reject/defer)
  4. Update baseline if approved
  5. Communicate decision

Template

markdown
# Change Request: [CR-XXX]

## Request Information
- Requested by: [Name]
- Date: [Date]
- Priority: High/Medium/Low

## Description
[What change is being requested]

## Justification
[Why the change is needed]

## Impact Analysis
- Scope: [Impact]
- Schedule: [+/- days]
- Cost: [+/- amount]
- Quality: [Impact]
- Risk: [New risks]

## Recommendation
[Approve/Reject/Defer]

## Decision
- Decision: [Approved/Rejected/Deferred]
- Decision maker: [Name]
- Date: [Date]
- Conditions: [If any]

Agent

Execute with: faion-pm-agent


M-PM-012: Quality Management Plan

Problem

Need to define quality standards and how to achieve them.

Framework

Quality Components:

  1. Quality Planning - Define standards
  2. Quality Assurance - Process audits
  3. Quality Control - Deliverable inspection

Cost of Quality:

Type Examples
Prevention Training, documentation, reviews
Appraisal Testing, inspections, audits
Internal Failure Rework, scrap, retesting
External Failure Warranty, returns, reputation

Template

Deliverable Quality Standard Metric Target Method
Code Code review passed Review score 4/5 Peer review
Design UX guidelines Heuristic eval 85% Expert review
Docs Style guide Compliance % 100% Checklist

Agent

Execute with: faion-pm-agent


M-PM-013: Acceptance Criteria Definition

Problem

Need clear, testable criteria for deliverable acceptance.

Framework

SMART Criteria:

  • Specific - Clear and unambiguous
  • Measurable - Quantifiable
  • Achievable - Realistic
  • Relevant - Aligned with objectives
  • Time-bound - When to verify

Template

Requirement ID Acceptance Criterion Test Method Pass/Fail
REQ-001 Response time < 200ms Load test
REQ-002 95% test coverage CI report
REQ-003 Zero critical bugs QA sign-off

Acceptance Levels

Level Performed By Purpose
Unit Developer Component works
Integration QA Components work together
System QA Full system works
User Customer Meets business needs

Agent

Execute with: faion-pm-agent


M-PM-014: Earned Value Management

Problem

Need integrated measurement of scope, schedule, and cost performance.

Framework

Core Metrics:

Metric Formula Meaning
PV Planned Value Budgeted cost of scheduled work
EV Earned Value Budgeted cost of completed work
AC Actual Cost Actual cost of completed work
SV EV - PV Schedule variance
CV EV - AC Cost variance
SPI EV / PV Schedule Performance Index
CPI EV / AC Cost Performance Index

Forecasting:

Metric Formula Meaning
EAC BAC / CPI Estimate at Completion
ETC EAC - AC Estimate to Complete
VAC BAC - EAC Variance at Completion
TCPI (BAC-EV)/(BAC-AC) To-Complete Performance Index

Interpretation:

Index > 1 = 1 < 1
SPI Ahead On track Behind
CPI Under budget On budget Over budget

Template

Period PV EV AC SV CV SPI CPI
Week 1
Week 2

Agent

Execute with: faion-pm-agent


M-PM-015: Project Dashboard Design

Problem

Need at-a-glance project health visualization for stakeholders.

Framework

Dashboard Sections:

  1. Overall Health (RAG status)
  2. Key Metrics (schedule, cost, scope)
  3. Milestone Status
  4. Risk Summary
  5. Action Items

RAG Status:

Color Status Action
Green On track Continue monitoring
Amber At risk Corrective action needed
Red Off track Escalation required

Template

+------------------+------------------+
|  OVERALL: GREEN  |  BUDGET: $XXX    |
+------------------+------------------+
|  Schedule: GREEN |  Cost: AMBER     |
|  Scope: GREEN    |  Quality: GREEN  |
+------------------+------------------+
|  MILESTONES                         |
|  [x] M1: Done    [ ] M2: In progress|
+------------------+------------------+
|  TOP RISKS                          |
|  R1: [desc] - AMBER                 |
+------------------+------------------+
|  ACTIONS                            |
|  A1: [action] - Due [date]          |
+-------------------------------------+

Agent

Execute with: faion-pm-agent


M-PM-016: Risk Register

Problem

Need to identify, assess, and track project risks systematically.

Framework

Risk Identification:

  • Brainstorming
  • Checklists
  • Interviews
  • SWOT analysis
  • Assumption analysis

Risk Assessment:

Probability Score
Very High 5
High 4
Medium 3
Low 2
Very Low 1
Impact Score
Catastrophic 5
Major 4
Moderate 3
Minor 2
Negligible 1

Risk Score = Probability x Impact

Template

ID Risk Description Category P I Score Response Owner Status
R1 ... Technical 3 4 12 Mitigate Name Open
R2 ... External 2 5 10 Transfer Name Open

Agent

Execute with: faion-pm-agent


M-PM-017: Risk Response Planning

Problem

Need to develop strategies and actions for identified risks.

Framework

Threat Responses:

Strategy Action When to Use
Avoid Eliminate threat High priority risks
Mitigate Reduce P or I Can influence factors
Transfer Shift to third party Insurance, contracts
Accept Acknowledge Low priority or unavoidable

Opportunity Responses:

Strategy Action When to Use
Exploit Ensure realization High value opportunities
Enhance Increase P or I Can influence factors
Share Partner Need capability/resources
Accept Take if occurs Low effort opportunities

Template

Risk ID Strategy Response Actions Trigger Owner Budget
R1 Mitigate Train team on new tech Start of project PM $5,000
R2 Transfer Purchase insurance Contract signing Legal $2,000

Agent

Execute with: faion-pm-agent


M-PM-018: Lessons Learned

Problem

Need to capture and apply knowledge from project experience.

Framework

Collection Points:

  • End of each phase/sprint
  • After significant events
  • Project closure

Categories:

  • What went well (continue)
  • What went poorly (change)
  • Recommendations (improve)

Template

markdown
# Lessons Learned: [Project/Phase]
Date: [Date]
Facilitator: [Name]

## What Went Well
| Item | Details | Recommendation |
|------|---------|----------------|
| | | Keep doing |

## What Went Poorly
| Item | Details | Root Cause | Recommendation |
|------|---------|------------|----------------|
| | | | Change process |

## Recommendations for Future Projects
| # | Recommendation | Priority | Owner |
|---|----------------|----------|-------|
| 1 | | High/Med/Low | |

## Attendees
[List of participants]

Agent

Execute with: faion-pm-agent


M-PM-019: Project Closure Checklist

Problem

Need to ensure proper project completion and transition.

Framework

Closure Activities:

  1. Verify deliverables accepted
  2. Complete financial closure
  3. Release resources
  4. Archive documentation
  5. Conduct lessons learned
  6. Celebrate success
  7. Administrative closure

Template

Activity Status Owner Notes
All deliverables accepted [ ] PM
Final payments processed [ ] Finance
Team released [ ] PM
Documentation archived [ ] PM
Lessons learned captured [ ] PM
Stakeholder communication [ ] PM
Contracts closed [ ] Procurement
Celebration held [ ] PM

Agent

Execute with: faion-pm-agent


M-PM-020: Project Status Report

Problem

Need standardized format for communicating project status.

Framework

Report Sections:

  1. Executive Summary (RAG + key message)
  2. Progress (completed, in progress, planned)
  3. Schedule Status (milestone view)
  4. Budget Status (actual vs planned)
  5. Risks and Issues
  6. Decisions Needed

Template

markdown
# Project Status Report
Project: [Name]
Period: [Start - End Date]
Author: [PM Name]

## Executive Summary
**Overall Status:** [GREEN/AMBER/RED]

[2-3 sentence summary of current state]

## Progress This Period
### Completed
- [Item 1]
- [Item 2]

### In Progress
- [Item 1] - [% complete]

### Planned Next Period
- [Item 1]

## Schedule
| Milestone | Planned | Forecast | Status |
|-----------|---------|----------|--------|
| M1 | [Date] | [Date] | GREEN |

## Budget
| Category | Budget | Actual | Variance |
|----------|--------|--------|----------|
| Total | $X | $Y | $Z |

## Risks and Issues
| ID | Description | Status | Action |
|----|-------------|--------|--------|

## Decisions Needed
| # | Decision | By Whom | By When |
|---|----------|---------|---------|

Agent

Execute with: faion-pm-agent


Agents Called

Agent Purpose
faion-pm-agent Executes PMBOK methodologies (M-PM-001 to M-PM-020)

Integration with Other Domain Skills

Domain Skill Integration Point
faion-sdd-domain-skill Task planning uses PMBOK scheduling
faion-ba-domain-skill Requirements feed into PMBOK scope
faion-product-domain-skill Product roadmap aligns with project schedule
faion-marketing-domain-skill Campaign planning uses PMBOK methods

PM Domain Skill v2.0 - 2026-01-18 Based on PMBOK 7th Edition (2021) and PMBOK 8 updates 8 Performance Domains | 12 Principles | 32 Methodologies (M-PM + M-PMT) Consolidated from: faion-pm-tools


Methodologies

ID Name File
M-PM-001 Stakeholder Engagement methodologies/M-PM-001_stakeholder_engagement.md
M-PM-001 Stakeholder Register methodologies/M-PM-001_stakeholder_register.md
M-PM-002 Raci Matrix methodologies/M-PM-002_raci_matrix.md
M-PM-003 Wbs Creation methodologies/M-PM-003_wbs_creation.md
M-PM-003 Work Breakdown Structure methodologies/M-PM-003_work_breakdown_structure.md
M-PM-004 Schedule Development methodologies/M-PM-004_schedule_development.md
M-PM-005 Cost Estimation methodologies/M-PM-005_cost_estimation.md
M-PM-006 Risk Management methodologies/M-PM-006_risk_management.md
M-PM-006 Risk Register methodologies/M-PM-006_risk_register.md
M-PM-007 Earned Value Management methodologies/M-PM-007_earned_value_management.md
M-PM-008 Change Control methodologies/M-PM-008_change_control.md
M-PM-009 Quality Management methodologies/M-PM-009_quality_management.md
M-PM-010 Communications Management methodologies/M-PM-010_communications_management.md
M-PM-010 Team Development methodologies/M-PM-010_team_development.md
M-PM-011 Project Integration methodologies/M-PM-011_project_integration.md
M-PM-012 Agile Hybrid Approaches methodologies/M-PM-012_agile_hybrid_approaches.md
M-PM-013 Resource Management methodologies/M-PM-013_resource_management.md
M-PM-014 Procurement Management methodologies/M-PM-014_procurement_management.md
M-PM-015 Lessons Learned methodologies/M-PM-015_lessons_learned.md
M-PM-016 Benefits Realization methodologies/M-PM-016_benefits_realization.md
M-PM-017 Project Closure methodologies/M-PM-017_project_closure.md
M-PM-018 Stakeholder Engagement methodologies/M-PM-018_stakeholder_engagement.md
M-PM-019 Scope Management methodologies/M-PM-019_scope_management.md
M-PM-020 Performance Domains Overview methodologies/M-PM-020_performance_domains_overview.md

Expand your agent's capabilities with these related and highly-rated skills.

Didn't find tool you were looking for?

Be as detailed as possible for better results