Project Manager role: PMBOK 7/8 (8 Performance Domains, 12 Principles), PM tools (Jira, ClickUp, Linear, GitHub Projects, Azure DevOps), risk/schedule/cost management, EVM, agile ceremonies, dashboards. 32 methodologies.
Install this agent skill to your Project
npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/faion-project-manager-faionfaion-faion-network
SKILL.md
PM Domain Skill
References
| Reference | Content | Lines |
|---|---|---|
| pm-tools.md | Jira, ClickUp, Linear, GitHub Projects, GitLab, Azure DevOps, Notion, Trello, migrations, dashboards | ~1926 |
Agents
| Agent | When to Use |
|---|---|
faion-pm-agent |
Execute PMBOK 7/8 methodologies for project management |
Communication: User's language. Docs/code: English.
Purpose
Orchestrates project management activities using PMBOK 7th Edition (2021) and PMBOK 8 principles. This domain skill provides professional PM methodologies for solopreneurs and teams.
3-Layer Architecture
Layer 1: Domain Skills (this) - orchestrators
|
v call
Layer 2: Agents - executors
|
v use
Layer 3: Technical Skills - tools
PMBOK 7 Performance Domains (8)
Performance domains are interactive, interrelated, and interdependent areas of focus that work together throughout a project.
PD-01: Stakeholder Performance Domain
Focus: Engaging stakeholders effectively throughout the project.
Activities
- Identify stakeholders - Who is affected by or can affect the project?
- Understand stakeholders - Analyze interests, power, influence, expectations
- Engage stakeholders - Develop appropriate engagement strategies
- Monitor engagement - Track and adapt engagement effectiveness
Outcomes
- Productive working relationship with stakeholders
- Stakeholder agreement on project objectives
- Stakeholders supportive of deliverables
- Stakeholders satisfied with outcomes
Checking Results
| Indicator | What to Check |
|---|---|
| Engagement | Are stakeholders actively participating? |
| Satisfaction | Are expectations being met? |
| Conflict | Are issues resolved constructively? |
| Support | Do stakeholders advocate for the project? |
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-001" (Stakeholder Register)
methodology: "M-PM-002" (Stakeholder Analysis Matrix)
PD-02: Team Performance Domain
Focus: Building and leading high-performing teams.
Activities
- Project manager leadership - Set vision, inspire, remove obstacles
- Team development - Build skills, foster collaboration
- Team culture - Create psychological safety, shared values
- High-performing teams - Enable autonomy, accountability
Outcomes
- Shared ownership of project
- High-performing team
- Appropriate leadership demonstrated
- Team members grow and develop
Team Development Stages
| Stage | Focus | Leader Action |
|---|---|---|
| Forming | Orientation | Direct, provide clarity |
| Storming | Conflict | Facilitate, resolve conflicts |
| Norming | Cohesion | Coach, enable collaboration |
| Performing | High function | Delegate, remove obstacles |
| Adjourning | Completion | Celebrate, transition |
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-003" (RACI Matrix)
methodology: "M-PM-004" (Team Charter)
PD-03: Development Approach and Life Cycle Performance Domain
Focus: Selecting and tailoring appropriate development approaches.
Development Approaches
| Approach | When to Use | Characteristics |
|---|---|---|
| Predictive | Stable requirements, known solution | Sequential phases, upfront planning |
| Iterative | Unknown solution, needs refinement | Repeated cycles, prototype-based |
| Incremental | Needs early value delivery | Feature-based releases |
| Agile | High uncertainty, rapid change | Iterative + incremental, adaptive |
| Hybrid | Mixed needs | Combines approaches |
Selection Factors
- Requirements stability
- Stakeholder availability
- Risk tolerance
- Regulatory constraints
- Team experience
Life Cycle Phases
- Starting - Authorization, initial scope
- Organizing and Preparing - Planning, team formation
- Carrying Out - Execution, monitoring
- Ending - Closure, transition
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-005" (Development Approach Selection)
methodology: "M-PM-006" (Project Life Cycle Design)
PD-04: Planning Performance Domain
Focus: Organizing and elaborating how work will be done.
Planning Components
| Component | Purpose | Key Activities |
|---|---|---|
| Scope | What to deliver | WBS, requirements |
| Schedule | When to deliver | Sequencing, estimation |
| Cost | How much it costs | Budgeting, reserves |
| Resources | Who/what does work | Team, equipment, materials |
| Quality | How good enough | Standards, metrics |
| Risk | What could go wrong | Identification, response |
| Communications | How to share info | Channels, frequency |
| Procurement | What to buy | Contracts, vendors |
| Stakeholder | How to engage | Strategies, monitoring |
Planning Progression
Progressive elaboration:
High-level --> Detailed --> Rolling wave
Uncertainty decreases as project progresses
Estimation Techniques
| Technique | Accuracy | When to Use |
|---|---|---|
| Analogous | Low | Early stages |
| Parametric | Medium | Historical data available |
| Bottom-up | High | Detailed scope defined |
| Three-point | Variable | Risk-aware estimation |
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-007" (WBS Creation)
methodology: "M-PM-008" (Schedule Development)
methodology: "M-PM-009" (Cost Estimation)
PD-05: Project Work Performance Domain
Focus: Executing project activities to deliver outcomes.
Activities
- Manage physical resources - Equipment, materials, facilities
- Manage procurements - Vendor relationships, contracts
- Monitor changes - Track scope, schedule, cost variances
- Enable learning - Capture and share knowledge
- Manage communications - Information flow to stakeholders
Project Work Processes
Plan -> Execute -> Monitor -> Adjust -> Repeat
| ^
+------------------------+
Communication Matrix
| Stakeholder | What | When | How | Who |
|---|---|---|---|---|
| Sponsor | Status summary | Weekly | PM | |
| Team | Daily progress | Daily | Standup | PM |
| Customer | Milestone report | Monthly | Meeting | PM |
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-010" (Communication Management Plan)
methodology: "M-PM-011" (Change Management Process)
PD-06: Delivery Performance Domain
Focus: Delivering value and outcomes throughout the project.
Value Delivery
| Concept | Description |
|---|---|
| Deliverables | Outputs produced by project work |
| Outcomes | End results from using deliverables |
| Benefits | Gains realized from outcomes |
| Value | Worth to stakeholders |
Delivery Approaches
| Approach | Delivery Timing | Examples |
|---|---|---|
| Single delivery | End of project | Construction, one-time event |
| Multiple deliveries | Throughout project | Software releases, phases |
| Continuous delivery | Ongoing | SaaS features, content |
Quality Management
Plan Quality -> Manage Quality -> Control Quality
| | |
v v v
Standards Prevention Inspection
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-012" (Quality Management Plan)
methodology: "M-PM-013" (Acceptance Criteria Definition)
PD-07: Measurement Performance Domain
Focus: Tracking progress and performance.
Key Metrics
| Category | Metrics |
|---|---|
| Schedule | SPI, variance, on-time % |
| Cost | CPI, variance, budget remaining |
| Scope | Requirements completed, defects |
| Quality | Defect rate, rework % |
| Resources | Utilization, productivity |
| Stakeholder | Satisfaction, engagement |
Earned Value Management (EVM)
| Metric | Formula | Interpretation |
|---|---|---|
| PV | Planned Value | Budget for scheduled work |
| EV | Earned Value | Budget for completed work |
| AC | Actual Cost | Actual spend |
| SV | EV - PV | Schedule variance |
| CV | EV - AC | Cost variance |
| SPI | EV / PV | Schedule performance (>1 good) |
| CPI | EV / AC | Cost performance (>1 good) |
| EAC | BAC / CPI | Estimate at completion |
Dashboard Elements
- Overall health indicator (RAG)
- Key performance metrics
- Trend analysis
- Risk status
- Milestone status
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-014" (Earned Value Management)
methodology: "M-PM-015" (Project Dashboard Design)
PD-08: Uncertainty Performance Domain
Focus: Navigating risks, ambiguity, and complexity.
Types of Uncertainty
| Type | Description | Response |
|---|---|---|
| Risk | Known unknowns, can estimate probability | Risk management |
| Ambiguity | Unclear understanding | Clarification, prototypes |
| Complexity | Interconnected systems | Systems thinking |
| Volatility | Rapid change | Flexibility, reserves |
Risk Response Strategies
For Threats:
- Avoid - Eliminate the threat
- Mitigate - Reduce probability or impact
- Transfer - Shift to third party
- Accept - Acknowledge without action
For Opportunities:
- Exploit - Ensure realization
- Enhance - Increase probability or impact
- Share - Transfer to best positioned party
- Accept - Take advantage if occurs
Risk Register
| ID | Risk | Probability | Impact | Score | Response | Owner |
|---|---|---|---|---|---|---|
| R1 | ... | H/M/L | H/M/L | P x I | Strategy | Name |
Agent Integration
Call faion-pm-agent with:
methodology: "M-PM-016" (Risk Register)
methodology: "M-PM-017" (Risk Response Planning)
PMBOK 7 Principles (12)
Principles guide behavior and decision-making throughout project work.
P-01: Stewardship
Statement: Be a diligent, respectful, and caring steward.
Application:
- Act with integrity and ethics
- Consider broad impact of decisions
- Be accountable for resources
- Respect others and their perspectives
Indicators:
- Trust from stakeholders
- Ethical decision-making
- Resource efficiency
- Long-term thinking
P-02: Team
Statement: Build a culture of accountability and respect.
Application:
- Foster collaborative environment
- Enable diverse perspectives
- Support individual and team growth
- Create psychological safety
Team Health Check:
- Members feel safe to speak up
- Conflicts resolved constructively
- Contributions recognized
- Learning encouraged
P-03: Stakeholders
Statement: Engage stakeholders proactively.
Application:
- Identify all affected parties
- Understand expectations and influence
- Communicate appropriately
- Build and maintain relationships
Engagement Levels:
| Level | Description |
|---|---|
| Unaware | Not aware of project |
| Resistant | Aware but opposed |
| Neutral | Aware, neither supportive nor resistant |
| Supportive | Aware and supportive |
| Leading | Actively engaged and championing |
P-04: Value
Statement: Focus on value.
Application:
- Align project with business objectives
- Prioritize work that delivers value
- Measure outcomes, not just outputs
- Continuously reassess value
Value Questions:
- What problem are we solving?
- Who benefits and how?
- How do we measure success?
- What is the cost of not doing this?
P-05: Systems Thinking
Statement: Recognize, evaluate, and respond to system dynamics.
Application:
- See the whole, not just parts
- Understand interdependencies
- Consider unintended consequences
- Optimize the system, not components
Systems View:
Internal: Project <-> Portfolio <-> Organization
External: Regulatory <-> Market <-> Technology <-> Society
P-06: Leadership
Statement: Demonstrate leadership behaviors.
Application:
- Inspire and motivate
- Adapt style to situation
- Enable others to lead
- Model desired behaviors
Leadership Styles:
| Style | When to Use |
|---|---|
| Directing | Low skill, high will |
| Coaching | Low skill, low will |
| Supporting | High skill, low will |
| Delegating | High skill, high will |
P-07: Tailoring
Statement: Tailor based on context.
Application:
- Adapt processes to project needs
- Consider constraints and environment
- Balance rigor with agility
- Document tailoring decisions
Tailoring Factors:
- Project size and complexity
- Team experience
- Organizational culture
- Regulatory requirements
- Risk tolerance
P-08: Quality
Statement: Build quality into processes and deliverables.
Application:
- Define quality standards upfront
- Prevent defects, don't just detect
- Integrate quality activities
- Continuously improve
Quality Dimensions:
- Performance (does it work?)
- Conformance (meets requirements?)
- Reliability (consistent?)
- Durability (long-lasting?)
- Serviceability (maintainable?)
P-09: Complexity
Statement: Navigate complexity.
Application:
- Recognize complexity sources
- Use appropriate strategies
- Avoid oversimplification
- Embrace emergence when needed
Complexity Sources:
| Source | Example |
|---|---|
| Human behavior | Stakeholder politics |
| System behavior | Integration issues |
| Ambiguity | Unclear requirements |
| Technological | New or unproven tech |
P-10: Risk
Statement: Optimize risk responses.
Application:
- Balance risk with reward
- Consider risk tolerance
- Address both threats and opportunities
- Maintain risk awareness
Risk Appetite Levels:
| Level | Characteristic |
|---|---|
| Risk-averse | Prefer certainty, avoid threats |
| Risk-neutral | Balanced approach |
| Risk-seeking | Accept higher risk for higher reward |
P-11: Adaptability and Resilience
Statement: Embrace adaptability and resilience.
Application:
- Build flexibility into plans
- Learn from experience
- Recover from setbacks
- Anticipate change
Resilience Practices:
- Short feedback cycles
- Reserve capacity
- Alternative strategies
- Continuous learning
P-12: Change
Statement: Enable change to achieve the envisioned future state.
Application:
- Prepare stakeholders for change
- Address resistance constructively
- Sustain change through reinforcement
- Measure change adoption
Change Readiness:
- Clear vision communicated
- Stakeholders prepared
- Support systems in place
- Quick wins planned
Methodologies (20)
M-PM-001: Stakeholder Register
Problem
Need to identify and track all project stakeholders with their characteristics and engagement approach.
Framework
-
Identify stakeholders
- Brainstorm with team
- Review organization charts
- Analyze contracts and agreements
-
Analyze stakeholders
- Power/Interest grid
- Influence/Impact matrix
- Salience model (Power, Legitimacy, Urgency)
-
Document in register
- Contact information
- Role and relationship
- Expectations and influence
- Engagement strategy
Template
| ID | Name | Role | Power | Interest | Current | Desired | Strategy |
|---|---|---|---|---|---|---|---|
| S1 | ... | ... | H/M/L | H/M/L | Level | Level | Approach |
Agent
Execute with: faion-pm-agent
M-PM-002: Stakeholder Analysis Matrix
Problem
Need to visualize stakeholder positioning for engagement planning.
Framework
Power/Interest Grid:
High Power
|
Keep | Manage
Satisfied | Closely
|
-----------+----------- High Interest
|
Monitor | Keep
(Minimum) | Informed
|
Low Power
Template
| Quadrant | Stakeholders | Strategy |
|---|---|---|
| Manage Closely | High power, high interest | Active engagement |
| Keep Satisfied | High power, low interest | Periodic updates |
| Keep Informed | Low power, high interest | Regular communication |
| Monitor | Low power, low interest | Minimal effort |
Agent
Execute with: faion-pm-agent
M-PM-003: RACI Matrix
Problem
Need to clarify roles and responsibilities for project activities.
Framework
| Role | Meaning | Rules |
|---|---|---|
| R Responsible | Does the work | At least one per activity |
| A Accountable | Final authority | Exactly one per activity |
| C Consulted | Input before decision | Can be multiple |
| I Informed | Notified of outcome | Can be multiple |
Template
| Activity | Role A | Role B | Role C | Role D |
|---|---|---|---|---|
| Task 1 | A | R | C | I |
| Task 2 | A | R | - | I |
| Task 3 | A | C | R | I |
Validation
- Each row has exactly one A
- Each row has at least one R
- A and R can be same person
- No role overload (too many Rs)
Agent
Execute with: faion-pm-agent
M-PM-004: Team Charter
Problem
Need to establish team agreements, norms, and working arrangements.
Framework
- Team Purpose - Why we exist
- Team Values - What we stand for
- Working Agreements - How we work
- Communication Norms - How we communicate
- Decision Making - How we decide
- Conflict Resolution - How we resolve issues
Template
# Team Charter: [Project Name]
## Purpose
[One sentence describing team's mission]
## Values
- [Value 1]: [Description]
- [Value 2]: [Description]
## Working Agreements
- [ ] Core hours: [time range]
- [ ] Response time: [expectation]
- [ ] Meeting etiquette: [norms]
## Communication
| Type | Channel | Response Time |
|------|---------|---------------|
| Urgent | [channel] | [time] |
| Normal | [channel] | [time] |
| FYI | [channel] | [time] |
## Decision Making
[Process for making team decisions]
## Conflict Resolution
[Steps for resolving disagreements]
## Signatures
[Team member acknowledgments]
Agent
Execute with: faion-pm-agent
M-PM-005: Development Approach Selection
Problem
Need to choose the right development approach for the project context.
Framework
Assessment Questions:
| Factor | Predictive | Agile |
|---|---|---|
| Requirements | Stable, well-defined | Evolving, emergent |
| Technology | Proven, familiar | New, experimental |
| Stakeholder availability | Limited | High |
| Team experience | Traditional PM | Agile methods |
| Risk tolerance | Low | High |
| Delivery frequency | Single | Continuous |
Scoring:
- Count factors favoring each approach
- Consider organizational constraints
- Hybrid if mixed results
Template
| Factor | Score (1-5) | Favors |
|---|---|---|
| Requirements stability | ||
| Technology novelty | ||
| Stakeholder availability | ||
| Team agile experience | ||
| Regulatory constraints | ||
| Need for early delivery | ||
| Total | Recommendation |
Agent
Execute with: faion-pm-agent
M-PM-006: Project Life Cycle Design
Problem
Need to structure the project into phases with appropriate gates.
Framework
Phase Components:
- Entry criteria
- Key activities
- Deliverables
- Exit criteria (gate)
Common Patterns:
| Pattern | Phases | Use Case |
|---|---|---|
| Waterfall | Requirements -> Design -> Build -> Test -> Deploy | Stable requirements |
| Iterative | Concept -> [Elaborate -> Build -> Review]* -> Transition | Solution discovery |
| Incremental | [Plan -> Develop -> Release]* | Phased delivery |
| Agile | [Sprint]* | Continuous adaptation |
Template
# Project Life Cycle: [Project Name]
## Phase 1: [Name]
- Entry: [Criteria]
- Activities: [List]
- Deliverables: [List]
- Gate: [Decision criteria]
## Phase 2: [Name]
...
Agent
Execute with: faion-pm-agent
M-PM-007: WBS Creation
Problem
Need to decompose project scope into manageable work packages.
Framework
Decomposition Rules:
- 100% rule - WBS contains all work
- Mutually exclusive - No overlap
- Deliverable-oriented - Focus on outcomes
- 8/80 rule - Work packages 8-80 hours
Levels:
- Project
- Deliverables / Phases
- Sub-deliverables
- Work Packages
Template
1.0 Project Name
1.1 Deliverable 1
1.1.1 Sub-deliverable 1.1
1.1.1.1 Work Package
1.1.1.2 Work Package
1.1.2 Sub-deliverable 1.2
1.2 Deliverable 2
1.3 Project Management
Validation Checklist
- All scope included (100% rule)
- No overlapping work
- Consistent decomposition level
- Work packages are 8-80 hours
- Deliverable-oriented (nouns)
Agent
Execute with: faion-pm-agent
M-PM-008: Schedule Development
Problem
Need to create a realistic project schedule with dependencies.
Framework
Steps:
- Define activities (from WBS)
- Sequence activities (dependencies)
- Estimate durations
- Develop schedule
- Identify critical path
Dependency Types:
| Type | Meaning | Example |
|---|---|---|
| FS | Finish-to-Start | Code before test |
| FF | Finish-to-Finish | Parallel completion |
| SS | Start-to-Start | Parallel start |
| SF | Start-to-Finish | Rare, relief coverage |
Estimation Methods:
- Expert judgment
- Analogous (similar projects)
- Parametric (formula-based)
- Three-point (O + 4M + P) / 6
Template
| ID | Activity | Duration | Predecessors | Start | End |
|---|---|---|---|---|---|
| A1 | ... | 5d | - | ||
| A2 | ... | 3d | A1 |
Agent
Execute with: faion-pm-agent
M-PM-009: Cost Estimation
Problem
Need to estimate project costs accurately for budgeting.
Framework
Cost Categories:
- Labor (internal, external)
- Materials and supplies
- Equipment (purchase, rental)
- Facilities
- Travel
- Reserves (contingency, management)
Estimation Techniques:
| Technique | Accuracy | Phase |
|---|---|---|
| Rough Order of Magnitude | -50% to +100% | Initiation |
| Budget Estimate | -10% to +25% | Planning |
| Definitive Estimate | -5% to +10% | Execution |
Template
| WBS ID | Description | Labor | Materials | Other | Total |
|---|---|---|---|---|---|
| 1.1.1 | ... | $ | $ | $ | $ |
| Subtotal | $ | $ | $ | $ | |
| Contingency (%) | $ | ||||
| Total Budget | $ |
Agent
Execute with: faion-pm-agent
M-PM-010: Communication Management Plan
Problem
Need to ensure effective information flow to all stakeholders.
Framework
5 W's of Communication:
- Who needs information?
- What information is needed?
- When is it needed?
- Where/how to deliver?
- Who is responsible?
Template
| Stakeholder | Information | Frequency | Channel | Owner | Notes |
|---|---|---|---|---|---|
| Sponsor | Status report | Weekly | PM | ||
| Team | Task updates | Daily | Standup | PM | |
| Customer | Milestone review | Monthly | Meeting | PM |
Communication Channels Formula
Channels = n(n-1) / 2
Where n = number of people
Example: 10 people = 45 channels
Agent
Execute with: faion-pm-agent
M-PM-011: Change Management Process
Problem
Need to control scope, schedule, and cost changes formally.
Framework
Change Control Process:
- Request submitted
- Impact analyzed
- Decision made (approve/reject/defer)
- Update baseline if approved
- Communicate decision
Template
# Change Request: [CR-XXX]
## Request Information
- Requested by: [Name]
- Date: [Date]
- Priority: High/Medium/Low
## Description
[What change is being requested]
## Justification
[Why the change is needed]
## Impact Analysis
- Scope: [Impact]
- Schedule: [+/- days]
- Cost: [+/- amount]
- Quality: [Impact]
- Risk: [New risks]
## Recommendation
[Approve/Reject/Defer]
## Decision
- Decision: [Approved/Rejected/Deferred]
- Decision maker: [Name]
- Date: [Date]
- Conditions: [If any]
Agent
Execute with: faion-pm-agent
M-PM-012: Quality Management Plan
Problem
Need to define quality standards and how to achieve them.
Framework
Quality Components:
- Quality Planning - Define standards
- Quality Assurance - Process audits
- Quality Control - Deliverable inspection
Cost of Quality:
| Type | Examples |
|---|---|
| Prevention | Training, documentation, reviews |
| Appraisal | Testing, inspections, audits |
| Internal Failure | Rework, scrap, retesting |
| External Failure | Warranty, returns, reputation |
Template
| Deliverable | Quality Standard | Metric | Target | Method |
|---|---|---|---|---|
| Code | Code review passed | Review score | 4/5 | Peer review |
| Design | UX guidelines | Heuristic eval | 85% | Expert review |
| Docs | Style guide | Compliance % | 100% | Checklist |
Agent
Execute with: faion-pm-agent
M-PM-013: Acceptance Criteria Definition
Problem
Need clear, testable criteria for deliverable acceptance.
Framework
SMART Criteria:
- Specific - Clear and unambiguous
- Measurable - Quantifiable
- Achievable - Realistic
- Relevant - Aligned with objectives
- Time-bound - When to verify
Template
| Requirement ID | Acceptance Criterion | Test Method | Pass/Fail |
|---|---|---|---|
| REQ-001 | Response time < 200ms | Load test | |
| REQ-002 | 95% test coverage | CI report | |
| REQ-003 | Zero critical bugs | QA sign-off |
Acceptance Levels
| Level | Performed By | Purpose |
|---|---|---|
| Unit | Developer | Component works |
| Integration | QA | Components work together |
| System | QA | Full system works |
| User | Customer | Meets business needs |
Agent
Execute with: faion-pm-agent
M-PM-014: Earned Value Management
Problem
Need integrated measurement of scope, schedule, and cost performance.
Framework
Core Metrics:
| Metric | Formula | Meaning |
|---|---|---|
| PV | Planned Value | Budgeted cost of scheduled work |
| EV | Earned Value | Budgeted cost of completed work |
| AC | Actual Cost | Actual cost of completed work |
| SV | EV - PV | Schedule variance |
| CV | EV - AC | Cost variance |
| SPI | EV / PV | Schedule Performance Index |
| CPI | EV / AC | Cost Performance Index |
Forecasting:
| Metric | Formula | Meaning |
|---|---|---|
| EAC | BAC / CPI | Estimate at Completion |
| ETC | EAC - AC | Estimate to Complete |
| VAC | BAC - EAC | Variance at Completion |
| TCPI | (BAC-EV)/(BAC-AC) | To-Complete Performance Index |
Interpretation:
| Index | > 1 | = 1 | < 1 |
|---|---|---|---|
| SPI | Ahead | On track | Behind |
| CPI | Under budget | On budget | Over budget |
Template
| Period | PV | EV | AC | SV | CV | SPI | CPI |
|---|---|---|---|---|---|---|---|
| Week 1 | |||||||
| Week 2 |
Agent
Execute with: faion-pm-agent
M-PM-015: Project Dashboard Design
Problem
Need at-a-glance project health visualization for stakeholders.
Framework
Dashboard Sections:
- Overall Health (RAG status)
- Key Metrics (schedule, cost, scope)
- Milestone Status
- Risk Summary
- Action Items
RAG Status:
| Color | Status | Action |
|---|---|---|
| Green | On track | Continue monitoring |
| Amber | At risk | Corrective action needed |
| Red | Off track | Escalation required |
Template
+------------------+------------------+
| OVERALL: GREEN | BUDGET: $XXX |
+------------------+------------------+
| Schedule: GREEN | Cost: AMBER |
| Scope: GREEN | Quality: GREEN |
+------------------+------------------+
| MILESTONES |
| [x] M1: Done [ ] M2: In progress|
+------------------+------------------+
| TOP RISKS |
| R1: [desc] - AMBER |
+------------------+------------------+
| ACTIONS |
| A1: [action] - Due [date] |
+-------------------------------------+
Agent
Execute with: faion-pm-agent
M-PM-016: Risk Register
Problem
Need to identify, assess, and track project risks systematically.
Framework
Risk Identification:
- Brainstorming
- Checklists
- Interviews
- SWOT analysis
- Assumption analysis
Risk Assessment:
| Probability | Score |
|---|---|
| Very High | 5 |
| High | 4 |
| Medium | 3 |
| Low | 2 |
| Very Low | 1 |
| Impact | Score |
|---|---|
| Catastrophic | 5 |
| Major | 4 |
| Moderate | 3 |
| Minor | 2 |
| Negligible | 1 |
Risk Score = Probability x Impact
Template
| ID | Risk Description | Category | P | I | Score | Response | Owner | Status |
|---|---|---|---|---|---|---|---|---|
| R1 | ... | Technical | 3 | 4 | 12 | Mitigate | Name | Open |
| R2 | ... | External | 2 | 5 | 10 | Transfer | Name | Open |
Agent
Execute with: faion-pm-agent
M-PM-017: Risk Response Planning
Problem
Need to develop strategies and actions for identified risks.
Framework
Threat Responses:
| Strategy | Action | When to Use |
|---|---|---|
| Avoid | Eliminate threat | High priority risks |
| Mitigate | Reduce P or I | Can influence factors |
| Transfer | Shift to third party | Insurance, contracts |
| Accept | Acknowledge | Low priority or unavoidable |
Opportunity Responses:
| Strategy | Action | When to Use |
|---|---|---|
| Exploit | Ensure realization | High value opportunities |
| Enhance | Increase P or I | Can influence factors |
| Share | Partner | Need capability/resources |
| Accept | Take if occurs | Low effort opportunities |
Template
| Risk ID | Strategy | Response Actions | Trigger | Owner | Budget |
|---|---|---|---|---|---|
| R1 | Mitigate | Train team on new tech | Start of project | PM | $5,000 |
| R2 | Transfer | Purchase insurance | Contract signing | Legal | $2,000 |
Agent
Execute with: faion-pm-agent
M-PM-018: Lessons Learned
Problem
Need to capture and apply knowledge from project experience.
Framework
Collection Points:
- End of each phase/sprint
- After significant events
- Project closure
Categories:
- What went well (continue)
- What went poorly (change)
- Recommendations (improve)
Template
# Lessons Learned: [Project/Phase]
Date: [Date]
Facilitator: [Name]
## What Went Well
| Item | Details | Recommendation |
|------|---------|----------------|
| | | Keep doing |
## What Went Poorly
| Item | Details | Root Cause | Recommendation |
|------|---------|------------|----------------|
| | | | Change process |
## Recommendations for Future Projects
| # | Recommendation | Priority | Owner |
|---|----------------|----------|-------|
| 1 | | High/Med/Low | |
## Attendees
[List of participants]
Agent
Execute with: faion-pm-agent
M-PM-019: Project Closure Checklist
Problem
Need to ensure proper project completion and transition.
Framework
Closure Activities:
- Verify deliverables accepted
- Complete financial closure
- Release resources
- Archive documentation
- Conduct lessons learned
- Celebrate success
- Administrative closure
Template
| Activity | Status | Owner | Notes |
|---|---|---|---|
| All deliverables accepted | [ ] | PM | |
| Final payments processed | [ ] | Finance | |
| Team released | [ ] | PM | |
| Documentation archived | [ ] | PM | |
| Lessons learned captured | [ ] | PM | |
| Stakeholder communication | [ ] | PM | |
| Contracts closed | [ ] | Procurement | |
| Celebration held | [ ] | PM |
Agent
Execute with: faion-pm-agent
M-PM-020: Project Status Report
Problem
Need standardized format for communicating project status.
Framework
Report Sections:
- Executive Summary (RAG + key message)
- Progress (completed, in progress, planned)
- Schedule Status (milestone view)
- Budget Status (actual vs planned)
- Risks and Issues
- Decisions Needed
Template
# Project Status Report
Project: [Name]
Period: [Start - End Date]
Author: [PM Name]
## Executive Summary
**Overall Status:** [GREEN/AMBER/RED]
[2-3 sentence summary of current state]
## Progress This Period
### Completed
- [Item 1]
- [Item 2]
### In Progress
- [Item 1] - [% complete]
### Planned Next Period
- [Item 1]
## Schedule
| Milestone | Planned | Forecast | Status |
|-----------|---------|----------|--------|
| M1 | [Date] | [Date] | GREEN |
## Budget
| Category | Budget | Actual | Variance |
|----------|--------|--------|----------|
| Total | $X | $Y | $Z |
## Risks and Issues
| ID | Description | Status | Action |
|----|-------------|--------|--------|
## Decisions Needed
| # | Decision | By Whom | By When |
|---|----------|---------|---------|
Agent
Execute with: faion-pm-agent
Agents Called
| Agent | Purpose |
|---|---|
| faion-pm-agent | Executes PMBOK methodologies (M-PM-001 to M-PM-020) |
Integration with Other Domain Skills
| Domain Skill | Integration Point |
|---|---|
| faion-sdd-domain-skill | Task planning uses PMBOK scheduling |
| faion-ba-domain-skill | Requirements feed into PMBOK scope |
| faion-product-domain-skill | Product roadmap aligns with project schedule |
| faion-marketing-domain-skill | Campaign planning uses PMBOK methods |
PM Domain Skill v2.0 - 2026-01-18 Based on PMBOK 7th Edition (2021) and PMBOK 8 updates 8 Performance Domains | 12 Principles | 32 Methodologies (M-PM + M-PMT) Consolidated from: faion-pm-tools
Methodologies
| ID | Name | File |
|---|---|---|
| M-PM-001 | Stakeholder Engagement | methodologies/M-PM-001_stakeholder_engagement.md |
| M-PM-001 | Stakeholder Register | methodologies/M-PM-001_stakeholder_register.md |
| M-PM-002 | Raci Matrix | methodologies/M-PM-002_raci_matrix.md |
| M-PM-003 | Wbs Creation | methodologies/M-PM-003_wbs_creation.md |
| M-PM-003 | Work Breakdown Structure | methodologies/M-PM-003_work_breakdown_structure.md |
| M-PM-004 | Schedule Development | methodologies/M-PM-004_schedule_development.md |
| M-PM-005 | Cost Estimation | methodologies/M-PM-005_cost_estimation.md |
| M-PM-006 | Risk Management | methodologies/M-PM-006_risk_management.md |
| M-PM-006 | Risk Register | methodologies/M-PM-006_risk_register.md |
| M-PM-007 | Earned Value Management | methodologies/M-PM-007_earned_value_management.md |
| M-PM-008 | Change Control | methodologies/M-PM-008_change_control.md |
| M-PM-009 | Quality Management | methodologies/M-PM-009_quality_management.md |
| M-PM-010 | Communications Management | methodologies/M-PM-010_communications_management.md |
| M-PM-010 | Team Development | methodologies/M-PM-010_team_development.md |
| M-PM-011 | Project Integration | methodologies/M-PM-011_project_integration.md |
| M-PM-012 | Agile Hybrid Approaches | methodologies/M-PM-012_agile_hybrid_approaches.md |
| M-PM-013 | Resource Management | methodologies/M-PM-013_resource_management.md |
| M-PM-014 | Procurement Management | methodologies/M-PM-014_procurement_management.md |
| M-PM-015 | Lessons Learned | methodologies/M-PM-015_lessons_learned.md |
| M-PM-016 | Benefits Realization | methodologies/M-PM-016_benefits_realization.md |
| M-PM-017 | Project Closure | methodologies/M-PM-017_project_closure.md |
| M-PM-018 | Stakeholder Engagement | methodologies/M-PM-018_stakeholder_engagement.md |
| M-PM-019 | Scope Management | methodologies/M-PM-019_scope_management.md |
| M-PM-020 | Performance Domains Overview | methodologies/M-PM-020_performance_domains_overview.md |
Recommended Agent Skills
Expand your agent's capabilities with these related and highly-rated skills.
agent-ops-spec
Manage specification documents in .agent/specs/. Use when user provides requirements, acceptance criteria, or feature descriptions that need to be tracked and validated against implementation.
agent-ops-state
Maintain .agent state files. Use at session start, after meaningful steps, and before concluding: read/update constitution/memory/focus/issues/baseline consistently.
agent-ops-spec
Manage specification documents in .agent/specs/. Use when user provides requirements, acceptance criteria, or feature descriptions that need to be tracked and validated against implementation.
agent-ops-testing
Test strategy, execution, and coverage analysis. Use when designing tests, running test suites, or analyzing test results beyond baseline checks.
agent-ops-testing
Test strategy, execution, and coverage analysis. Use when designing tests, running test suites, or analyzing test results beyond baseline checks.
agent-ops-state
Maintain .agent state files. Use at session start, after meaningful steps, and before concluding: read/update constitution/memory/focus/issues/baseline consistently.
Didn't find tool you were looking for?