Agent skill
environmental-permitting
Florida environmental permitting expertise. Invoke for SJRWMD permits, wetland assessments, flood zone analysis, or stormwater requirements.
Install this agent skill to your Project
npx add-skill https://github.com/breverdbidder/spd-site-plan-dev/tree/main/.claude/skills/environmental-permitting
SKILL.md
Florida Environmental Permitting Skill
When to Invoke
- Questions about SJRWMD permits
- Wetland assessment needs
- Flood zone determination
- Stormwater management
- Environmental constraints
SJRWMD Permit Types
ERP (Environmental Resource Permit)
Required for:
- Projects disturbing >1 acre
- Work in wetlands
- Stormwater systems
- Activities in/near surface waters
Thresholds:
- <4,000 sq ft impervious: Exempt
- 4,000 sq ft - 1 acre: Noticed General
-
1 acre: Individual permit
WUP (Water Use Permit)
Required for:
- Irrigation systems >1 acre
- Commercial water use
- Dewatering operations
Flood Zone Determination
FEMA Zone Designations
| Zone | Risk Level | Requirements |
|---|---|---|
| X | Minimal | Standard construction |
| A | High (no BFE) | Elevation required |
| AE | High (BFE known) | Build above BFE |
| VE | Coastal high hazard | Strict requirements |
Building Requirements by Zone
- Zone X: No special requirements
- Zone A/AE: Lowest floor ≥ BFE + 1 ft
- Zone VE: Open foundation, ≥ BFE + 1 ft
Wetland Assessment Process
-
Desktop Review
- Check National Wetlands Inventory (NWI)
- Review aerial imagery
- Identify potential wetland areas
-
Field Delineation (if needed)
- Hire certified wetland delineator
- Flag wetland boundaries
- Prepare delineation report
-
Permit Strategy
- Avoid: Best option
- Minimize: Reduce impact
- Mitigate: Compensate for unavoidable impact
Stormwater Requirements
Retention/Detention
- Pre vs post development runoff
- 25-year, 24-hour storm
- Water quality treatment
Common Solutions
- Retention ponds
- Dry detention
- Swales
- Underground systems
Timeline Estimates
| Permit | Review Time |
|---|---|
| ERP General | 30 days |
| ERP Individual | 90 days |
| WUP | 90 days |
| Wetland Delineation | 30-60 days |
Key Contacts
- SJRWMD: 386-329-4500
- FDEP: 850-245-2118
- US Army Corps: 904-232-1666
Recommended Agent Skills
Expand your agent's capabilities with these related and highly-rated skills.
brevard-site-development
Brevard County site plan development expertise. Invoke when analyzing parcels, checking zoning, or navigating the permit process in Brevard County, Florida.
construction-takeoff
Automated construction quantity surveying from PDF plans using AI. Processes construction drawings, extracts quantities/materials, analyzes competitor solutions via Firecrawl, calculates costs, and generates Excel-based takeoff reports for stakeholder collaboration.
spd_docx
skill-creator
Guide for creating effective skills. This skill should be used when users want to create a new skill (or update an existing skill) that extends Claude's capabilities with specialized knowledge, workflows, or tool integrations.
handoff
Compact the current conversation into a handoff document for another agent to pick up.
obsidian-vault
Search, create, and manage notes in the Obsidian vault with wikilinks and index notes. Use when user wants to find, create, or organize notes in Obsidian.
Didn't find tool you were looking for?