Agent skill

Device Inspection

Execute comprehensive L1-L4 network device inspection. Use when user asks to "inspect all devices", "run comprehensive health check", "full network audit", or needs systematic L1-L4 analysis across multiple devices.

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/data/device-inspection

SKILL.md

Device Inspection - Comprehensive L1-L4

Applicable Scenarios

  • Comprehensive network health assessment (all test devices)
  • Full stack network inspection (L1-L4)
  • Network baseline establishment and verification
  • Pre-maintenance complete audit

Identification Signals

User questions contain: "inspect", "comprehensive", "full check", "all devices", "L1-L4"

Execution Strategy

  1. List all devices in 'test' group using list_devices(group="test")
  2. For each device, execute comprehensive inspection covering L1 (Physical), L2 (Data Link), L3 (Network), L4 (Transport)
  3. Generate consolidated report with device-by-device status
  4. Flag anomalies across all layers

Comprehensive Inspection Template (L1-L4)

L1 - Physical Layer

  • show version (Device model, serial, uptime)
  • show inventory (Hardware modules, power supplies, fans)
  • show environment all (Temperature, power status, fan status)
  • show interfaces (Physical port states, media types)

L2 - Data Link Layer

  • show vlan brief (VLAN configuration and status)
  • show spanning-tree summary (STP topology, root bridge)
  • show spanning-tree detail (Port states, costs)
  • show cdp neighbors (CDP neighbor discovery)
  • show mac address-table (MAC table status, count)

L3 - Network Layer

  • show ip route summary (Route count and protocol summary)
  • show ip ospf neighbor (OSPF neighbor status)
  • show ip ospf interface brief (OSPF interface states)
  • show ip bgp summary (BGP neighbor status)
  • show ip bgp vpnv4 all summary (VPNv4 status if applicable)

L4 - Transport Layer & Services

  • show tcp brief (TCP session count)
  • show processes cpu (CPU utilization and process breakdown)
  • show memory statistics (Memory usage across memory pools)
  • show interfaces counters errors (Error counters on all interfaces)
  • show interfaces counters dropped (Dropped packet counters)

Report Format

Executive Summary

📋 test Network Comprehensive Inspection Report
Inspection Time: 2026-01-08 14:30:00
Total Devices: 8
Overall Status: 2 devices OK, 5 devices WARNING, 1 device CRITICAL

Device Summary:
├─ R1 (10.1.1.1) ✅ OK - L1:✅ L2:✅ L3:✅ L4:✅
├─ R2 (10.1.1.2) ⚠️ WARNING - L1:⚠️ L2:✅ L3:✅ L4:✅
├─ R3 (10.1.1.3) ⚠️ WARNING - L1:✅ L2:✅ L3:✅ L4:⚠️
├─ R4 (10.1.1.4) ⚠️ WARNING - L1:⚠️ L2:✅ L3:✅ L4:✅
├─ S1 (10.2.1.1) ✅ OK - L1:✅ L2:✅ L3:✅ L4:✅
├─ S2 (10.2.1.2) ⚠️ WARNING - L1:✅ L2:⚠️ L3:✅ L4:✅
├─ A1 (10.3.1.1) ⚠️ WARNING - L1:✅ L2:✅ L3:⚠️ L4:✅
└─ A2 (10.3.1.2) ❌ CRITICAL - L1:❌ L2:✅ L3:✅ L4:⚠️

Device-by-Device Detailed Results

Each device gets a full L1-L4 report:

╔══════════════════════════════════════════════════════╗
║ Device: R1 (10.1.1.1) - Core Router                 ║
║ Platform: Cisco IOS XE                              ║
║ Status: ✅ ALL SYSTEMS OK                           ║
╚══════════════════════════════════════════════════════╝

Layer 1 (Physical):
  CPU Utilization: 15% (5min avg) ✅
  Memory Usage: 62% (avaitestle: 8.2GB) ✅
  Temperature: 42°C (threshold: 70°C) ✅
  Power Supplies: 2/2 ACTIVE ✅
  Fans: 6/6 SPINNING ✅

Layer 2 (Data Link):
  VLAN Count: 45 ✅
  Active Ports: 48/48 UP ✅
  STP Root: YES (Priority: 24576) ✅
  LLDP Neighbors: 4 discovered ✅

Layer 3 (Network):
  IPv4 Routes: 2,847 routes ✅
  OSPF Neighbors: 3 FULL ✅
  BGP Neighbors: 2 ESTABLISHED ✅
  Routing Errors: 0 ✅

Layer 4 (Transport):
  Interface Errors: 0 (24h avg) ✅
  Dropped Packets: 0 (24h avg) ✅
  TCP Sessions: 45 active ✅
  UDP Flows: 128 active ✅

Anomaly Details & Recommendations

⚠️ WARNING: R2 - Temperature trending high
Current: 58°C | Trend: +2°C/hour | Threshold: 70°C
Recommendation: Monitor closely, ensure adequate airflow

❌ CRITICAL: A2 - Power supply #1 degraded
Status: FAILED | Uptime before failure: 847 days
Recommendation: Replace PSU immediately before other PSU fails

Consolidated Findings

Critical Issues (Immediate Action):
1. A2 Power Supply Failure - Replace PSU
2. A1 BGP Neighbor Flapping - Check link stability

Warnings (Monitor):
1. R2 Temperature trending up - Check cooling
2. S2 STP Bridge Priority - May need rebalancing
3. R3 Interface FCS Errors increasing - Check optics

Informational (Good Status):
- All core devices operating normally
- test network stable and well-managed

Multi-Device Inspection Process

  1. Device Collection: Query all devices in 'test' group
  2. Parallel Execution: Execute inspection template on each device
  3. Data Aggregation: Collect and normalize results
  4. Analysis: Compare against health baselines
  5. Reporting: Generate comprehensive multi-device report with:
    • Overall network health score
    • Device-by-device status
    • Cross-layer dependency analysis
    • Consolidated recommendations

Output Artifact

reports/test-comprehensive-inspection-20260108-143000.md
├─ Executive Summary Dashboard
├─ Device Status Matrix
├─ Layer-by-Layer Details (8 devices × 4 layers = 32 sections)
├─ Anomaly Analysis
├─ Historical Comparison (vs. previous inspection)
└─ Recommendations & Actions

Didn't find tool you were looking for?

Be as detailed as possible for better results