Create Incident Report

Overview

Create a structured incident report that can be used during a live incident for coordination or after resolution for post-mortem analysis. The report separates what happened (timeline) from why it happened (root cause) and what to do about it (action items), with clear severity definitions and impact quantification.

Workflow

  1. Read project context — Check .chalk/docs/engineering/ for:

    • Architecture docs (to identify affected systems and dependencies)
    • Previous incident reports (to match format and learn from patterns)
    • Monitoring and alerting docs (to reference dashboards)
    • On-call and escalation procedures
  2. Determine incident status — From $ARGUMENTS and conversation:

    • Active incident: The incident is ongoing. Create the report in real-time coordination mode with fields to fill as information becomes available. Mark unknowns explicitly.
    • Post-incident: The incident is resolved. Create a complete retrospective report.
    • Identify what is known so far: symptoms, affected systems, timeline, actions taken
  3. Assign severity — Using the severity matrix:

    • SEV-1 (Critical): Complete service outage, data loss or corruption, security breach, revenue-impacting failure affecting all users
    • SEV-2 (High): Major feature outage, significant degradation for most users, data integrity risk
    • SEV-3 (Medium): Partial feature outage, degraded performance, affects subset of users, workaround available
    • SEV-4 (Low): Minor issue, minimal user impact, cosmetic degradation, no data risk
  4. Construct the timeline — Build a chronological sequence of events:

    • Use timestamps in UTC (or note the timezone)
    • Record: when the issue started, when it was detected, when each action was taken, when it was resolved
    • For active incidents: record events as they happen, leaving future entries as TBD
    • Distinguish between: detection time, response time, mitigation time, resolution time
    • Include automated alerts, human observations, and customer reports
  5. Quantify impact — Be specific about:

    • Number of users affected (or percentage of total)
    • Duration of impact (from user perspective, not just internal detection)
    • Revenue impact (if measurable or estimable)
    • Data impact (records affected, data lost or corrupted)
    • SLA impact (was an SLA breached? which one?)
    • Downstream impact (did this affect other teams or services?)
  6. Document actions taken — For each action during the incident:

    • What was done
    • Who did it
    • When it was done
    • What was the result (did it help, make it worse, or have no effect?)
  7. Identify root cause — For post-incident reports:

    • Distinguish between the trigger (what caused the incident to start) and the root cause (why the system was vulnerable to that trigger)
    • Use the "5 Whys" technique to dig past symptoms
    • For active incidents: note preliminary root cause with confidence level
  8. Write action items — Concrete, assigned, time-bound follow-ups:

    • Immediate: Prevent recurrence of this exact incident
    • Short-term: Address the systemic weakness that allowed it
    • Long-term: Architectural or process improvements
    • Each action item has an owner and a due date
  9. Determine the next file number — List files in .chalk/docs/engineering/ matching *_incident_*. Find the highest number and increment by 1.

  10. Write the report — Save to .chalk/docs/engineering/<n>_incident_<date>_<slug>.md.

  11. Confirm — Present the report with severity, impact summary, and key action items highlighted.

Filename Convention

<number>_incident_<YYYY_MM_DD>_<slug>.md

Examples:

  • 11_incident_2024_11_15_payment_outage.md
  • 14_incident_2024_12_03_database_failover.md

Incident Report Format

markdown
# Incident Report: <Descriptive Title>

**Severity**: SEV-1 | SEV-2 | SEV-3 | SEV-4
**Status**: Active | Mitigated | Resolved
**Date**: <YYYY-MM-DD>
**Duration**: <total time from detection to resolution>
**Incident Commander**: <name or TBD>
**Report Author**: <name>

## Summary

<One paragraph: What happened, what was the impact, and how was it resolved. Written for a reader who needs to understand the incident in 30 seconds.>

## Impact

| Dimension | Measurement |
|-----------|-------------|
| Users Affected | <number or percentage> |
| Duration (user-facing) | <time from first user impact to resolution> |
| Duration (detection to resolution) | <internal response time> |
| Revenue Impact | <estimated dollar amount or "not applicable"> |
| Data Impact | <records affected, data lost, or "no data impact"> |
| SLA Breach | <Yes — SLA X breached by Y minutes / No> |
| Downstream Services | <list of affected dependent services or "none"> |

## Severity Justification

<Why this severity level was assigned. Reference the severity matrix.>

## Timeline

All times in <timezone>.

| Time | Event | Actor |
|------|-------|-------|
| <HH:MM> | <First symptom or trigger event> | System |
| <HH:MM> | Alert fired: <alert name> | Monitoring |
| <HH:MM> | Incident acknowledged by <name> | <name> |
| <HH:MM> | Investigation began: <what was checked first> | <name> |
| <HH:MM> | Root cause identified: <brief description> | <name> |
| <HH:MM> | Mitigation applied: <what was done> | <name> |
| <HH:MM> | Service restored, monitoring for stability | <name> |
| <HH:MM> | Incident declared resolved | <name> |

## Current Status

<For active incidents: What is the current state? What is being worked on? What is the next expected update?>

<For resolved incidents: Confirmation that the service is fully restored and stable.>

## Detection

| Method | Detail |
|--------|--------|
| How detected | Alert / Customer report / Internal observation |
| Time to detect | <minutes from incident start to first detection> |
| Alert name | <name of the alert that fired, or "no alert — detected manually"> |

**Detection gap analysis**: <Was detection fast enough? If not, what alert should be added?>

## Immediate Actions Taken

| Action | Result | Who | When |
|--------|--------|-----|------|
| <Action description> | Helped / No effect / Made worse | <name> | <HH:MM> |
| <Action description> | <result> | <name> | <HH:MM> |

## Root Cause

### Trigger
<What specific event started the incident? E.g., "A deployment at 14:00 introduced a database query without an index.">

### Root Cause
<Why was the system vulnerable to that trigger? E.g., "No query performance review in the PR process. No slow-query alerting in production.">

### Contributing Factors
- <Factor 1: e.g., "Staging database is too small to reproduce production performance issues">
- <Factor 2: e.g., "No load testing for new database queries">

### 5 Whys

1. **Why** did the service go down? → <answer>
2. **Why** did <answer>? → <deeper answer>
3. **Why** did <deeper answer>? → <even deeper>
4. **Why** did <even deeper>? → <systemic issue>
5. **Why** did <systemic issue exist>? → <root cause>

## Lessons Learned

### What went well
- <Things that worked during the response>

### What went poorly
- <Things that did not work or were missing>

### Where we got lucky
- <Things that could have been worse but were not, by chance>

## Action Items

### Immediate (this week)

| ID | Action | Owner | Due Date | Status |
|----|--------|-------|----------|--------|
| AI-1 | <Prevent exact recurrence> | <name> | <date> | Open |

### Short-Term (this month)

| ID | Action | Owner | Due Date | Status |
|----|--------|-------|----------|--------|
| AI-2 | <Address systemic weakness> | <name> | <date> | Open |

### Long-Term (this quarter)

| ID | Action | Owner | Due Date | Status |
|----|--------|-------|----------|--------|
| AI-3 | <Architectural improvement> | <name> | <date> | Open |

Severity Matrix

Severity User Impact Data Impact Revenue Impact Response Time
SEV-1 Complete outage for all users Data loss or corruption Significant revenue loss Immediate — all hands
SEV-2 Major feature down for most users Data integrity risk Moderate revenue impact Within 30 minutes
SEV-3 Feature degraded for some users No data impact Minimal revenue impact Within 2 hours
SEV-4 Minor issue for few users No data impact No revenue impact Next business day

Active Incident Mode

When creating a report during an active incident, use these conventions:

  • Mark unknown fields as TBD or Under investigation
  • Update the timeline as events occur
  • Keep the Summary section current with the latest status
  • Use the Current Status section for real-time coordination
  • Root Cause section should say "Preliminary: " with a confidence level
  • Action Items should focus on immediate mitigation, not long-term improvements (those come after resolution)

Anti-patterns

  • Blame language — "Engineer X caused the outage by deploying bad code" is blame. "A deployment introduced a query without an index" is a factual description. Incident reports describe systems and events, not assign personal fault. Blame discourages reporting and transparency.
  • No timeline — An incident report without a timeline is a narrative, not an investigation tool. Timestamps reveal detection gaps, response delays, and coordination failures. Every significant event needs a timestamp.
  • No impact quantification — "Some users were affected" is not useful. How many? For how long? What was the revenue impact? Quantified impact drives priority for prevention investments and provides accountability.
  • Mixing "what happened" with "why" — The timeline records what happened and when. The root cause section explains why. Mixing them creates a confusing narrative. Keep them separate: timeline is facts, root cause is analysis.
  • Action items without owners or dates — "We should add monitoring" is not an action item. "Add slow-query alerting for queries exceeding 500ms — Owner: Backend Team — Due: 2024-12-15" is an action item. Without ownership and deadlines, action items are wishes.
  • Skipping "what went well" — Incident reports that only list failures demoralize teams. Acknowledging fast detection, effective communication, or successful rollback reinforces good practices.
  • One-time reports for recurring incidents — If the same type of incident keeps happening, the action items from previous reports are not being completed. Reference previous incidents and escalate the systemic issue.
  • Post-mortem theater — Writing a detailed report and then never following up on action items is worse than not writing the report. Track action item completion and hold regular reviews.