Agent skill
aposd-optimizing-critical-paths
Optimize performance through mandatory measure-first workflow with 3 stages: MEASURE (gate) -> FUNDAMENTAL FIX -> CRITICAL PATH REDESIGN. Use when code is too slow, laggy, hangs, doesn't scale, has timeouts, OOM errors, or high CPU/memory. Emphasize that simpler code usually runs faster. Triggers on: performance issues, optimization needed, takes forever, profiling. Produces profiling-backed optimization with verified improvement.
Install this agent skill to your Project
npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/other/aposd-optimizing-critical-paths
SKILL.md
Skill: aposd-optimizing-critical-paths
STOP - The Measure-First Rule
Don't optimize based on intuition—measure first. Intuitions about performance are unreliable, even for experienced developers.
Stage 1 is a GATE: You cannot proceed to optimization without actual profiling data.
The Simplicity-Performance Relationship
| Myth | Reality |
|---|---|
| "Performance requires complexity" | Simpler code usually runs faster |
| "Clean design sacrifices speed" | Clean design and high performance are compatible |
| "Optimization means adding code" | Optimization often means removing code |
Why simplicity improves performance:
- Fewer special cases = no code to check for those cases
- Deep classes = more work per call, fewer layer crossings
- Each layer crossing adds overhead
- Complicated code does extraneous or redundant work
Expensive Operations Reference
Know these costs when choosing between alternatives:
| Operation | Cost | Context |
|---|---|---|
| Network (datacenter) | 10–50 μs | Tens of thousands of instructions |
| Network (wide-area) | 10–100 ms | Millions of instructions |
| Disk I/O | 5–10 ms | Millions of instructions |
| Flash storage | 10–100 μs | Thousands of instructions |
| Dynamic memory allocation | Significant | malloc/new, freeing, GC overhead |
| Cache miss | Few hundred cycles | Often determines overall performance |
Performance Optimization Workflow
Stage 1: Measurement First (MANDATORY GATE)
BEFORE making any performance changes:
1. MEASURE existing system behavior
- Where does the system spend most time?
- Not just "system is slow" — identify specific locations
2. IDENTIFY small number of very specific places
- With ideas for improvement
- Focus on what matters most
3. ESTABLISH baseline
- You'll need this to verify improvements
What counts as valid measurement:
- Actual profiling data (timing, call counts, memory usage)
- Multiple runs to account for variance
- Specific hotspot identification, not just "it's slow"
What does NOT count:
- "User said it's slow" (user perception ≠ bottleneck location)
- Pattern-matching to Expensive Operations table
- "This is obviously expensive" (intuition)
- "I'll measure after I make the change" (confirmation bias)
⚠️ Stage 1 is a GATE, not a suggestion. You cannot proceed to Stage 2 without completing measurement.
Performance Dimensions: When measuring, identify WHICH dimension is the problem:
- Throughput: Operations per second
- Latency: Time per operation
- Memory: Peak/average usage, allocation rate
- CPU: Utilization percentage
Different problems require different solutions.
Stage 2: Look for Fundamental Fixes
FIRST, check for fundamental fixes (preferred over code tweaks):
□ Can you add a cache?
□ Can you use a different algorithm? (e.g., balanced tree vs. list)
□ Can you bypass layers? (e.g., kernel bypass for networking)
IF fundamental fix exists → implement using standard design techniques
IF NOT → proceed to critical path redesign
Stage 3: Critical Path Redesign (Last Resort)
ONLY when no fundamental fix is available:
1. ASK: What is the smallest amount of code for the common case?
2. DISREGARD existing code structure entirely
- Imagine writing a new method that implements JUST the critical path
3. IGNORE special cases in current code
- Consider only data needed for critical path
- Choose most convenient data structure
4. DEFINE "the ideal"
- The simplest and fastest code assuming complete redesign freedom
- Even if not practically achievable, it's your target
5. DESIGN the rest of the class around these critical paths
After Making Changes
1. RE-MEASURE to verify measurable performance difference
2. EVALUATE the tradeoff:
- Did changes provide significant speedup (with data)? → Keep
- Did changes make system simpler AND at least as fast? → Keep
- Neither? → BACK THEM OUT
⚠️ "Simpler" alone is not enough. You must verify the simpler version is at least as fast.
Anti-Rationalization Table
| Rationalization | Counter |
|---|---|
| "User said it's slow, that's my measurement" | User perception ≠ bottleneck location. Measure to find WHERE. |
| "Looking at the table, this is obviously expensive" | Pattern-matching isn't profiling. Measure actual time. |
| "I'll make the change then measure to verify" | Confirmation bias. Measure FIRST to find the real bottleneck. |
| "Setting up profiling is too complex" | If you can't measure, you can't verify improvement. Do the work. |
| "This scope is too small to measure" | Micro-optimizations without measurement add complexity for nothing. |
| "I checked the fundamental fix checklist" | Checklist is for ideas AFTER measurement shows the bottleneck. |
| "The code is simpler now, so it's faster" | Simpler doesn't automatically mean faster. Verify with measurement. |
| "I found a red flag pattern" | Red flags are descriptive, not prescriptive. Measure if it's actually slow. |
| "I already profiled extensively" | Share the data. Without data, it's still intuition. |
Red Flags
| Red Flag | Symptom | Performance Impact |
|---|---|---|
| Death by Thousand Cuts | Many small inefficiencies everywhere | System 5–10x slower; no single fix helps |
| Pass-Through Methods | Method with identical signature to caller | Unnecessary layer crossing overhead |
| Shallow Layers | Multiple layers providing same abstraction | Each call adds overhead |
| Repeated Special Cases | Same conditions checked multiple times | Redundant work on every call |
| Premature Optimization | Optimizing without measurement | Adds complexity without verified benefit |
| Intuition-Based Changes | "This should be faster" without data | Unreliable even for experts |
Performance-Aware Development
Default approach during normal development:
- Develop awareness of fundamentally expensive operations
- Choose naturally efficient alternatives when equally clean options exist
- If performance turns out to be a problem, optimize later
- Exception: Clear evidence performance is critical → implement faster approach immediately
When to Optimize Immediately
| Situation | Action |
|---|---|
| Clear evidence performance is critical | Implement faster approach now |
| Faster design adds only small, hidden complexity | May be worthwhile |
| Faster design adds lot of complexity OR complicates interfaces | Start simple, optimize later |
Consolidation Techniques
When optimizing critical paths, look for ways to consolidate:
| Technique | Example |
|---|---|
| Encode multiple conditions in single value | Variable that is 0 when any of several special cases apply |
| Single test for multiple cases | Replace 6 individual checks with 1 combined check |
| Combine layers into single method | Critical path handled in one method, not three |
| Merge variables | Combine multiple values into single structure |
Quick Reference
PERFORMANCE OPTIMIZATION PRIORITY:
1. MEASURE (MANDATORY GATE)
- Actual profiling data, not intuition
- Identify which dimension: throughput, latency, memory, CPU
- Establish baseline before any changes
- No measurement = no optimization
2. FUNDAMENTAL FIX - Preferred approach
- Cache? Better algorithm? Bypass layers?
- Only consider AFTER measurement shows the bottleneck
3. CRITICAL PATH - Last resort
- What's the minimum code for common case?
- Disregard existing structure
- Define "the ideal"
4. VERIFY - After changes
- Re-measure with same methodology
- Faster with data? Keep
- Simpler AND at least as fast? Keep
- Neither? BACK OUT
THE RULE:
Measure → Identify → Fix → Verify
Never skip steps. Never assume.
Chain
| After | Next |
|---|---|
| Optimization done | Verify performance improved |
Recommended Agent Skills
Expand your agent's capabilities with these related and highly-rated skills.
agent-ops-spec
Manage specification documents in .agent/specs/. Use when user provides requirements, acceptance criteria, or feature descriptions that need to be tracked and validated against implementation.
agent-ops-state
Maintain .agent state files. Use at session start, after meaningful steps, and before concluding: read/update constitution/memory/focus/issues/baseline consistently.
agent-ops-spec
Manage specification documents in .agent/specs/. Use when user provides requirements, acceptance criteria, or feature descriptions that need to be tracked and validated against implementation.
agent-ops-testing
Test strategy, execution, and coverage analysis. Use when designing tests, running test suites, or analyzing test results beyond baseline checks.
agent-ops-testing
Test strategy, execution, and coverage analysis. Use when designing tests, running test suites, or analyzing test results beyond baseline checks.
agent-ops-state
Maintain .agent state files. Use at session start, after meaningful steps, and before concluding: read/update constitution/memory/focus/issues/baseline consistently.
Didn't find tool you were looking for?